Search Contract Opportunities

Construction Manager-at-Risk Services for Construction of New Fire Station 6 and Optional Construction of New Fire Station 9 and Renovation of Fire Station 3

ID: 2025-87-B • State: Texas
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

Background
The Town of Flower Mound is soliciting proposals for Construction Manager-at-Risk (CMAR) services for the construction of a new Fire Station 6, with an optional Fire Station 9 and renovation of Fire Station 3. The Town aims to enhance its emergency services infrastructure through this project, which is part of a broader initiative to improve public safety facilities. The selected contractor will work closely with the Town and the project architect to ensure effective cost management and scheduling throughout the design and construction phases.

Work Details
The project includes:

1. **Fire Station 6 (Base Contract)**: Located on a 6.64-acre site at 6801 Canyon Falls Drive, it will feature:
- Four (4) pull-through apparatus bays
- ICC-500 Storm Shelter with restroom
- Training classroom/community room that doubles as an Emergency Operations Center (EOC)
- Police office/break area
- Community library kiosk/study area
- Fitness area, day room, kitchen/dining area, outdoor patio for five (5) firefighters and two (2) officers per shift
- Hot/cold therapy integrated into fitness/wellness area
- Secure fenced area for staff vehicles
- Emergency generator within the secure fenced area
- Separate office space for other Town departments
- Fuel island (dual fuel)

2. **Fire Station 9 (Optional)**: To be located on approximately 3 acres near Aberdeen Drive, it will provide similar amenities as Fire Station 6 but without office space for other departments, community library kiosk, or fuel island.

3. **Remodel of Fire Station 3**: If Fire Station 9 is constructed, this will include interior remodeling to accommodate logistics and/or Fire Marshal office space.

**Anticipated Budgets**:
- Fire Station 6: $12,000,000
- Fire Station 9: $11,000,000
- Remodel of Fire Station 3: $2,000,000

Period of Performance
Construction is anticipated to start in Spring 2027 with a duration of approximately:
- 15 months for Fire Stations 6 and 9 through substantial completion.
- 5 months for the remodel of Fire Station 3.

Place of Performance
The construction will take place in Flower Mound, Texas at specified locations including:
- New Fire Station 6 at 6801 Canyon Falls Drive,
- New Fire Station 9 on Aberdeen Drive,
- Existing Fire Station 3.

Bidder Requirements
Bidders must demonstrate adequate resources, experience, and qualifications in providing CMAR services. They must also comply with local prevailing wage rates and provide performance and payment bonds for the full construction cost upon submission of the Guaranteed Maximum Price (GMP).

Overview

Opportunity Type
Offline Bid
Opportunity ID
2025-87-B
Response Deadline
July 8, 2025 Past Due
Date Posted
June 13, 2025
Source

Est. Value Range
Experimental
$12,000,000 - $25,000,000 (AI estimate)
Agency Distribution
Moderate
On 6/13/25 TX in Texas issued Offline Bid Construction Manager-at-Risk Services for New Fire Station 6, Optional Fire Station 9, and Renovation of Fire Station 3 with ID 2025-87-B due 7/8/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Construction Manager-at-Risk Services for Construction of New Fire Station 6 and Optional Construction of New Fire Station 9 and Renovation of Fire Station 3

Opportunity Assistant


AI Analysis

AI Generate

Similar Active Opportunities