Search Contract Opportunities

Bellaire Boulevard Phase 1 Water, Sewer, Drainage, and Paving Improvements within Fort Bend County Municipal Utility District No. 275

ID: 32701-804-01-PAV • State: Texas
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

Background
The Bellaire Boulevard Phase 1 project is initiated by the Fort Bend County Municipal Utility District No. 275, aimed at improving water, sewer, drainage, and paving infrastructure within the district.
The project is designed to enhance public utility services and infrastructure in Fort Bend County, Texas.

Work Details
The scope of work includes the construction of:
- Water Lines: 12" C900 DR-18 PVC CL 150 water line (3,026 LF), 12" C900 DR18 PVC CL 150 restrained joint water line (245 LF), fire hydrant assemblies (6 units), gate valves (7 units), blow-off valves (2 units), and various other fittings and appurtenances.
- Sanitary Sewer: Installation of 12" and 18" SDR26 PR160 PVC sanitary sewer lines (1,277 LF and 243 LF respectively), standard precast concrete manholes (13 units), inflow protection devices (13 units), and additional connections.
- Storm Sewer: Installation of various sizes of RCP storm sewer pipes (including 18", 24", 36", and 60"), junction boxes, manholes, and inlet leads.
- Paving Improvements: Reinforced concrete pavement (21,395 SY), asphalt pavement (188 tons), curb installation, traffic signs, ADA compliant wheelchair ramps, and other associated paving works.
- Miscellaneous items include mobilization for operations, SWPPP compliance, turf establishment by hydromulch, and various additional work items as specified in the bid proposal.

Period of Performance
The contract work is expected to commence within ten calendar days after the notice to proceed is issued.
The contractor must achieve substantial completion within a specified number of calendar days after this notice.

Place of Performance
The project will be performed within Fort Bend County Municipal Utility District No. 275 in Texas.

Bidder Requirements
Bidders must provide a completed TEC Form 1295 as required by Texas Government Code ยง 2252.908 prior to contract award.
Additionally, bidders are required to furnish performance bonds and payment bonds in an amount equal to the total contract price from a surety company licensed in Texas with a minimum Best Key Rating of 'B+'.
Bidders must also comply with prevailing wage rates as established by local regulations.
Loading Map
Loading Map

Overview

Opportunity ID
32701-804-01-PAV
Version
1
Response Deadline
May 20, 2026 Due in 1 Days
Date Posted
April 30, 2026
Est. Value Range
Experimental
$1,800,000 - $4,200,000 (AI estimate)
Agency Distribution
High
Source
On 4/30/26 Fort Bend County Municipal Utility District No. 275 Construction / Engineering in Texas issued Bellaire Boulevard Phase 1 Water, Sewer, Drainage, and Paving Improvements within Fort Bend County Municipal Utility District No. 275 with ID 32701-804-01-PAV due 5/19/26.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Bellaire Boulevard Phase 1 Water, Sewer, Drainage, and Paving Improvements within Fort Bend County Municipal Utility District No. 275

Opportunity Assistant


AI Analysis

AI Generate

Similar Active Opportunities