Arrivals and Departures Hall (AEDP)
ID: 140981 • State: Texas
Opportunity Assistant
Loading
Description
Background
The project aims to facilitate the continued growth of Austin-Bergstrom International Airport (AUS) and establish it as the preferred airport for Central Texas. The existing Barbara Jordan Terminal (BJT) has surpassed its intended limits, and this project is essential to alleviate the strain on the existing infrastructure.
Work Details
The project involves designing a new Arrival and Departures Hall (A/D Hall) to replace the existing Red Garage, including the re-alignment of Presidential Blvd, curbside and new roadways, pedestrian bridges connecting parking and rental car facilities, and all associated utilities infrastructure work.
The A/D Hall building will include passenger ticketing check-in lobby, domestic baggage claim, enhanced passenger circulation, concessions, public restrooms, and additional space for airlines, DOA, tenants including TSA, and airport support and building systems.
The project also includes renovation required in the existing BJT to support its eventual conversion to a dedicated airside Concourse A.
Period of Performance
Project Completion: Fall 2030
Place of Performance
The project will be performed at Austin-Bergstrom International Airport (AUS), Austin, Texas.
The project aims to facilitate the continued growth of Austin-Bergstrom International Airport (AUS) and establish it as the preferred airport for Central Texas. The existing Barbara Jordan Terminal (BJT) has surpassed its intended limits, and this project is essential to alleviate the strain on the existing infrastructure.
Work Details
The project involves designing a new Arrival and Departures Hall (A/D Hall) to replace the existing Red Garage, including the re-alignment of Presidential Blvd, curbside and new roadways, pedestrian bridges connecting parking and rental car facilities, and all associated utilities infrastructure work.
The A/D Hall building will include passenger ticketing check-in lobby, domestic baggage claim, enhanced passenger circulation, concessions, public restrooms, and additional space for airlines, DOA, tenants including TSA, and airport support and building systems.
The project also includes renovation required in the existing BJT to support its eventual conversion to a dedicated airside Concourse A.
Period of Performance
Project Completion: Fall 2030
Place of Performance
The project will be performed at Austin-Bergstrom International Airport (AUS), Austin, Texas.
Overview
Agency
Pre-Bid Conference
05/08/2024, 09:00 AM
Opportunity ID
140981
Response Deadline
June 5, 2024
Past Due
Date Posted
April 30, 2024
Agency Distribution
Moderate
Source
On 4/30/24 City of Austin in Texas issued Arrivals and Departures Hall (AEDP) with ID 140981 due 6/5/24.
Contacts
Documents
Posted documents for Arrivals and Departures Hall (AEDP)
Opportunity Assistant
AI Analysis
AI Generate
Additional Details
Solicitation Number
RFQS 6100 CLMP376
Special Notes
Compliance Plan Required.