Additional details and bid documents available on www.CivCast.comhttps://www.civcastusa.com/user/project/687a785f37e7ec11492b49b2/dashboardThe Project consists of a 211 GSF building housing two TAS-compliant restrooms with a sharedplumbing chase. The structure is constructed of reinforced masonry walls with steel roof framingand a standing seam metal roof. Site improvements include one van-accessible parking spacewith an accessible sidewalk leading to the building entrances, as well as utility connections forwater, wastewater, and electrical service. The project also includes removal and replacement of anexisting fence and other miscellaneous site work.Bids will be received for a single prime contract. Bids shall be on a lump sum basis as indicated in the BidForm.Contract Documents and Specifications can be viewed at www.CivCast.com.Bidders are required to complete Document 00 45 13, Qualification Statement. Prequalification of Biddersis required. Due to the specialized nature of the construction, the experience and qualifications of Bidderswill be evaluated by the OWNER'S Project Manager based upon recommendations of a technical reviewpanel prior to the opening of Bids. Only those Bids submitted by Bidders determined by the OWNER'SProject Manager to be qualified will be considered. Bids received from Bidders who are not prequalified willbe returned unopened.Bids shall be accompanied by a cashier's check, certified check, or acceptable Bid Bond on a state ornational bank in an amount not less than five percent (5%) of the possible total of the bid submitted,payable without recourse to the City of Hutto, Texas, or an acceptable bid bond for the same amount froma reliable surety company as a guarantee that the bidder will enter into a contract and execute requiredPerformance and Payment Bonds within ten (10) days after notice of award of the contract.The successful contractor must furnish a Performance Bond upon the form provided in the amount ofone hundred percent (100%) of the contract price, a material and labor Payment Bond upon the formprovided in the amount of one hundred percent (100%) of the contract price, and Maintenance Bond uponthe form provided in the amount of one hundred percent (100%) of the contract price, from a suretyauthorized under the laws of the State of Texas to act as a surety on bonds for principals within ten (10)days after the notice of award of the contract.The right is reserved, as the interest of the Owner may require, to reject any and all bids, to waive anyinformality in the bids received, and to select the bid best suited to the Owner's best interest. Thesuccessful contractor must have completed a minimum of three similar projects within the last five years.
Background
The City of Hutto is issuing a contract for the construction of the Adam Orgain Restroom project, which aims to provide two TAS-compliant restrooms in a new building.
The project aligns with the city's mission to enhance public facilities and accessibility for its residents.
Work Details
The project consists of constructing a ±211 GSF building that includes two TAS-compliant restrooms with a shared plumbing chase.
The structure will feature reinforced masonry walls, steel roof framing, and a standing seam metal roof.
Site improvements will include one van-accessible parking space with an accessible sidewalk leading to the building entrances, utility connections for water, wastewater, and electrical service.
Additionally, the project involves the removal and replacement of an existing fence and other miscellaneous site work.
Bids are to be submitted on a lump sum basis as indicated in the Bid Form.
Period of Performance
The construction is expected to take 183 calendar days from the notice to proceed.
Place of Performance
The contract will be performed at Adam Orgain Park, located at 1001 Co Rd 137, Hutto, TX 78634.
Bidder Requirements
Bidders must complete Document 00 45 13, Qualification Statement, as prequalification is required due to the specialized nature of the construction.
Bids must be accompanied by a cashier's check, certified check, or acceptable Bid Bond amounting to at least five percent (5%) of the total bid.
The successful contractor must furnish Performance and Payment Bonds in amounts equal to one hundred percent (100%) of the contract price within ten (10) days after notice of award.
Bidders must have completed a minimum of three similar projects within the last five years.