Description
Background
The City of Lubbock, TX is seeking competitive sealed proposals for the construction of a 2.0 million-gallon elevated storage tank as part of its water utility infrastructure improvements. This project aims to enhance the city's water storage capacity and ensure a reliable water supply for its residents.
Work Details
The contractor will be responsible for all labor and materials necessary to construct the 34th Street 2.0 MG Elevated Storage Tank. The work includes site preparation, tank construction, installation of associated piping and fittings, and any necessary site restoration.
The project must comply with all applicable local, state, and federal regulations regarding construction and safety standards. A performance bond is required if the contract price exceeds $100,000, and a payment bond is required if it exceeds $50,000.
Period of Performance
The construction is expected to be substantially completed within 335 consecutive calendar days from the date specified in the Notice to Proceed issued by the City of Lubbock.
Place of Performance
The work will be performed at the designated site in Lubbock, Texas.
Bidder Requirements
Bidders must provide a cashier's or certified check or proposal bond equal to 5% of the total proposal amount as a guarantee that they will enter into a contract within ten business days after being notified of award.
Additionally, bidders are required to comply with Texas Government Code Chapter 2258 regarding prevailing wage rates.
The City of Lubbock, TX is seeking competitive sealed proposals for the construction of a 2.0 million-gallon elevated storage tank as part of its water utility infrastructure improvements. This project aims to enhance the city's water storage capacity and ensure a reliable water supply for its residents.
Work Details
The contractor will be responsible for all labor and materials necessary to construct the 34th Street 2.0 MG Elevated Storage Tank. The work includes site preparation, tank construction, installation of associated piping and fittings, and any necessary site restoration.
The project must comply with all applicable local, state, and federal regulations regarding construction and safety standards. A performance bond is required if the contract price exceeds $100,000, and a payment bond is required if it exceeds $50,000.
Period of Performance
The construction is expected to be substantially completed within 335 consecutive calendar days from the date specified in the Notice to Proceed issued by the City of Lubbock.
Place of Performance
The work will be performed at the designated site in Lubbock, Texas.
Bidder Requirements
Bidders must provide a cashier's or certified check or proposal bond equal to 5% of the total proposal amount as a guarantee that they will enter into a contract within ten business days after being notified of award.
Additionally, bidders are required to comply with Texas Government Code Chapter 2258 regarding prevailing wage rates.
Loading Map
Loading Map
Overview
Agency
Opportunity ID
RFP26-19423-TF
Response Deadline
Feb. 19, 2026
Past Due
Date Posted
Feb. 12, 2026
Source
Est. Value Range
Experimental
$3,000,000 - $6,000,000
(AI estimate)
Agency Distribution
High
On 2/12/26 City of Lubbock in Texas issued 34th Street 2.0 MG Elevated Storage Tank with ID RFP26-19423-TF due 2/18/26.
Contacts
Documents
Posted documents for 34th Street 2.0 MG Elevated Storage Tank
Opportunity Assistant
AI Analysis
AI Generate
Classifications
Additional Details
Class Codes
91200-Construction Services, General (Incl. Maintenance And Repair Services);