2025-026 Seeling Drainage Phase 4

ID: 2025-026 • State: Texas
Get Real Time Alerts from 40k+ Federal, State and Local Agencies
Find Now

Description

The City of San Antonio (City), Public Works Department (PW) is issuing a Request for Competitive Sealed Proposals (RFCSP) for qualified firms (Respondents) to provide construction services for the Seeling Drainage Phase 4 (Lowery Drive to St. Cloud and Placid Drive from Sage Drive to Pardo Circle) (Project). The project consists of the construction of Seeling Drainage Phase 4 (Lowery Drive to St. Cloud and Placid Drive from Sage Drive to Pardo Circle), a 2022 Bond Program project.

Located in Council District 7, area residents have reported localized drainage issues of storm runoff entering their property. The proposed project will construct underground drainage infrastructure upstream of the previously completed Seeling Channel Phase 3 project, a COSA 2017 Bond project. The project will mitigate localized drainage issues and increase safety and mobility within the project area.

Background
The City of San Antonio, through its Public Works Department, is issuing a Request for Competitive Sealed Proposals (RFCSP) for qualified firms to provide construction services for the Seeling Drainage Phase 4 project. This project, part of the 2022 Bond Program, aims to address localized drainage issues reported by residents in Council District 7, where storm runoff has been entering properties. The construction will involve underground drainage infrastructure upstream of the previously completed Seeling Channel Phase 3 project, enhancing safety and mobility in the area.

Work Details
The scope of work includes the installation of an underground storm-drain system and associated roadway reconstruction. This encompasses curbs, sidewalks, water, sewer, gas improvements, driveway approaches, and any other necessary work as per the project plans and specifications.

Additionally, two alternates are proposed:
1. Reconstruction of Placid Drive from Sage Drive to Pardo Circle with similar improvements;
2. Reconstruction of Placid Drive from Pardo Circle to Seeling Boulevard including curbs, sidewalks, and driveways. The total construction cost estimate is $22,741,177 with a contract duration of 600 calendar days.

Period of Performance
The contract will be performed over a period of 600 calendar days starting from the Notice to Proceed.

Place of Performance
The project will be executed in Council District 7 within the City of San Antonio.

Bidder Requirements
Respondents must comply with specific requirements including providing a Subcontractor/Supplier Utilization Plan indicating at least 14% participation by Minority/Women Business Enterprises (M/WBE) and 1% by African American Business Enterprises (AABE). They must also submit various forms including a Contracts Disclosure Form and a Litigation Disclosure Form. Additionally, compliance with prevailing wage rates as per City Ordinance Number 2008-11-20-1045 is required.

Overview

Opportunity ID
2025-026
Version
1
Response Deadline
June 6, 2025 Due in 12 Days
Date Posted
April 4, 2025
Est. Value Range
Experimental
$22,741,177 (Agency Estimate)
Agency Distribution
High
Source
On 4/4/25 City of San Antonio in Texas issued Seeling Drainage Phase 4 Construction Services with ID 2025-026 due 6/5/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for 2025-026 Seeling Drainage Phase 4

Additional Details

Class Codes
91345-Construction, Sewer And Storm Drain; 91347-Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps); 91350-Construction, Street (Major And Residential)(Includes Reconstruction); 91356-Construction, Utility/Underground Projects;

Similar Active Opportunities