CMAQ Signal System Upgrades
ID: 2026-ITB-02
• Alt ID: CM-9318 (8)
• State: Tennessee
Opportunity Assistant
Loading
Description
Background
The City of Brentwood is undertaking the CMAQ Signal System Upgrades project as part of a Congestion Mitigation and Air Quality (CMAQ) improvement initiative. The goal is to enhance traffic flow, reduce congestion, and improve pedestrian safety at 44 intersections throughout the city. This project will ensure compliance with standards set by the Tennessee Department of Transportation (TDOT) and the Federal Highway Administration (FHWA).
Work Details
The project involves the installation and implementation of traffic control and signal system improvements across 44 intersections, covering a length of 1.055 miles. Specific upgrades include:
- Installation of upgraded traffic signals as required.
- Installation of video detection systems at designated intersections.
- Installation of accessible pedestrian signals (APS) at designated intersections.
- Construction or modification of ADA-compliant curb ramps at 19 intersections.
- Programming and implementation of optimized traffic signal timing, including adjustments to pedestrian crossing timings and intervals.
All project bids must comply with TDOT's standard specifications.
Period of Performance
The completion time for the contract is specified as on or before 270 calendar days after the issuance of the notice to proceed.
Place of Performance
The work will be performed at various intersections throughout the City of Brentwood, Tennessee.
Bidder Requirements
Bidders must be prequalified with the Tennessee Department of Transportation prior to submitting proposals. A 0% Disadvantaged Business Enterprise (DBE) goal has been set for this project, which must be met or exceeded. Bidders are encouraged to utilize DBE or minority/women-owned firms.
The City of Brentwood is undertaking the CMAQ Signal System Upgrades project as part of a Congestion Mitigation and Air Quality (CMAQ) improvement initiative. The goal is to enhance traffic flow, reduce congestion, and improve pedestrian safety at 44 intersections throughout the city. This project will ensure compliance with standards set by the Tennessee Department of Transportation (TDOT) and the Federal Highway Administration (FHWA).
Work Details
The project involves the installation and implementation of traffic control and signal system improvements across 44 intersections, covering a length of 1.055 miles. Specific upgrades include:
- Installation of upgraded traffic signals as required.
- Installation of video detection systems at designated intersections.
- Installation of accessible pedestrian signals (APS) at designated intersections.
- Construction or modification of ADA-compliant curb ramps at 19 intersections.
- Programming and implementation of optimized traffic signal timing, including adjustments to pedestrian crossing timings and intervals.
All project bids must comply with TDOT's standard specifications.
Period of Performance
The completion time for the contract is specified as on or before 270 calendar days after the issuance of the notice to proceed.
Place of Performance
The work will be performed at various intersections throughout the City of Brentwood, Tennessee.
Bidder Requirements
Bidders must be prequalified with the Tennessee Department of Transportation prior to submitting proposals. A 0% Disadvantaged Business Enterprise (DBE) goal has been set for this project, which must be met or exceeded. Bidders are encouraged to utilize DBE or minority/women-owned firms.
Loading Map
Loading Map
Overview
Agency
Opportunity ID
2026-ITB-02
Response Deadline
June 24, 2026
Due in 22 Days
Date Posted
May 27, 2026
Source
Pre-Bid Conference
No pre-bid conference requirement or date identified in the provided text.
Q&A Deadline
Vendor questions must be submitted electronically via the City of Brentwood ProcureNow portal: https://secure.procurenow.com/portal/brentwoodtn. Deadline for questions: June 10, 2026.
Est. Value Range
Experimental
$800,000 - $2,500,000
(AI estimate)
Agency Distribution
Moderate
On 5/27/26 Engineering in Tennessee issued Signal System Upgrades with ID 2026-ITB-02 due 6/24/26.
Contacts
Documents
Posted documents for CMAQ Signal System Upgrades
Opportunity Assistant
AI Analysis
AI Generate