HVAC Replacement - Design-Build - Four Locations
ID: 326-83
• State: South Carolina
Opportunity Assistant
Loading
Description
Background
The School District of Greenville County (District) is seeking proposals for HVAC Replacement - Design-Build services at four locations: Thomas E. Kerns Elementary, Blythe Academy, Slater-Marietta Elementary, and Golden Strip Child Development Center. The District aims to enhance the HVAC systems in accordance with current codes and specifications outlined in this solicitation.
Work Details
The scope of work includes the design, demolition of existing HVAC systems, and installation of new equipment at the specified schools. Specific tasks include verifying sizing for cooling, heating, and ventilation; designing necessary changes; documenting modifications; submitting plans to OSF; conducting grounding and bonding studies; fire alarm design at Slater-Marietta and Blythe; coordinating with commissioning and test balance teams; protecting floors during installation; storing and disposing of equipment; installing new equipment including various types of air handling units (AHUs), rooftop units (RTUs), variable air volume (VAV) boxes, and boiler systems.
Each location has specific requirements:
- **Slater-Marietta**: Fire alarm system, 2 OAUs (7369 CFM and 10328 CFM), 8 RTUs, 2 ground-mounted units for gym, conversion of front office from single zone to VAV, 55 FPVAV boxes, boiler system.
- **Thomas Kerns**: 1 HVU (kitchen), boiler system, 9 HW unit heaters, 12 RTUs.
- **Blythe**: Fire alarm system, 87 FPVAVs, boiler system, 9 RTUs, 4 OAUs.
- **Golden Strip CDC**: 4 RTUs, 1 OAU, 2 ERVs, 21 VAVs (mix of fan powered and shutoff), and 2 split systems.
Period of Performance
The contract will be performed over a period starting from August 1, 2026 to January 1, 2029. Key milestones include Engineering Substantial Completion by January 15, 2027; Phase One Substantial Completion by August 1, 2027; Phase Two Substantial Completion by August 1, 2028.
Place of Performance
Work will be performed at four locations within Greenville County: Slater-Marietta Elementary School in Marietta SC; Thomas E. Kerns Elementary School in Greenville SC; Blythe Academy Elementary School in Greenville SC; Golden Strip Child Development Center in Simpsonville SC.
Bidder Requirements
Bidders must provide performance and payment bonds as required by the District. No portion of the contract may be subcontracted without prior written approval from a GCS Procurement Officer. Proposers must comply with all applicable regulations while on District property.
The School District of Greenville County (District) is seeking proposals for HVAC Replacement - Design-Build services at four locations: Thomas E. Kerns Elementary, Blythe Academy, Slater-Marietta Elementary, and Golden Strip Child Development Center. The District aims to enhance the HVAC systems in accordance with current codes and specifications outlined in this solicitation.
Work Details
The scope of work includes the design, demolition of existing HVAC systems, and installation of new equipment at the specified schools. Specific tasks include verifying sizing for cooling, heating, and ventilation; designing necessary changes; documenting modifications; submitting plans to OSF; conducting grounding and bonding studies; fire alarm design at Slater-Marietta and Blythe; coordinating with commissioning and test balance teams; protecting floors during installation; storing and disposing of equipment; installing new equipment including various types of air handling units (AHUs), rooftop units (RTUs), variable air volume (VAV) boxes, and boiler systems.
Each location has specific requirements:
- **Slater-Marietta**: Fire alarm system, 2 OAUs (7369 CFM and 10328 CFM), 8 RTUs, 2 ground-mounted units for gym, conversion of front office from single zone to VAV, 55 FPVAV boxes, boiler system.
- **Thomas Kerns**: 1 HVU (kitchen), boiler system, 9 HW unit heaters, 12 RTUs.
- **Blythe**: Fire alarm system, 87 FPVAVs, boiler system, 9 RTUs, 4 OAUs.
- **Golden Strip CDC**: 4 RTUs, 1 OAU, 2 ERVs, 21 VAVs (mix of fan powered and shutoff), and 2 split systems.
Period of Performance
The contract will be performed over a period starting from August 1, 2026 to January 1, 2029. Key milestones include Engineering Substantial Completion by January 15, 2027; Phase One Substantial Completion by August 1, 2027; Phase Two Substantial Completion by August 1, 2028.
Place of Performance
Work will be performed at four locations within Greenville County: Slater-Marietta Elementary School in Marietta SC; Thomas E. Kerns Elementary School in Greenville SC; Blythe Academy Elementary School in Greenville SC; Golden Strip Child Development Center in Simpsonville SC.
Bidder Requirements
Bidders must provide performance and payment bonds as required by the District. No portion of the contract may be subcontracted without prior written approval from a GCS Procurement Officer. Proposers must comply with all applicable regulations while on District property.
Loading Map
Loading Map
Overview
Opportunity ID
326-83
Response Deadline
June 25, 2026
Due in 10 Days
Date Posted
May 20, 2026
Source
Est. Value Range
Experimental
$3,500,000 - $9,000,000
(AI estimate)
Agency Distribution
High
On 5/20/26 Greenville County Schools in South Carolina issued HVAC Replacement - Design-Build - Four Locations with ID 326-83 due 6/25/26.