Exterior Renovations at Myrtle Beach Convention Center
ID: 25-R0020
• State: South Carolina
Opportunity Assistant
Loading
Description
Background
The City of Myrtle Beach is seeking qualifications from professional contractors with relevant project experience for exterior renovations at the Myrtle Beach Convention Center, located at 2101 North Oak Street, Myrtle Beach, SC 29577. The Convention Center has served both visitors and the community for many years. The original concourse design has proven challenging to maintain. This project aims to provide a sustainable structure that will improve operational costs.
Work Details
The scope of work includes:
- Replacing the main concourse sloped glazing roof with a low slope roof structure.
- Installing new architectural metal overhangs.
- Constructing new EIFS (Exterior Insulation and Finish System) covered walls.
- Adding a new curtain wall clerestory.
- Installing new ceilings and lighting.
More detailed work specifications will be provided to qualified contractors. The construction duration is anticipated to be approximately 12 to 18 months, requiring flexibility and coordination with Convention Center staff to minimize disruptions as the building will remain occupied during renovations.
Period of Performance
The anticipated construction duration is approximately 12 to 18 months.
Place of Performance
Myrtle Beach Convention Center, 2101 North Oak Street, Myrtle Beach, SC 29577.
The City of Myrtle Beach is seeking qualifications from professional contractors with relevant project experience for exterior renovations at the Myrtle Beach Convention Center, located at 2101 North Oak Street, Myrtle Beach, SC 29577. The Convention Center has served both visitors and the community for many years. The original concourse design has proven challenging to maintain. This project aims to provide a sustainable structure that will improve operational costs.
Work Details
The scope of work includes:
- Replacing the main concourse sloped glazing roof with a low slope roof structure.
- Installing new architectural metal overhangs.
- Constructing new EIFS (Exterior Insulation and Finish System) covered walls.
- Adding a new curtain wall clerestory.
- Installing new ceilings and lighting.
More detailed work specifications will be provided to qualified contractors. The construction duration is anticipated to be approximately 12 to 18 months, requiring flexibility and coordination with Convention Center staff to minimize disruptions as the building will remain occupied during renovations.
Period of Performance
The anticipated construction duration is approximately 12 to 18 months.
Place of Performance
Myrtle Beach Convention Center, 2101 North Oak Street, Myrtle Beach, SC 29577.
Loading Map
Loading Map
Overview
Agency
Opportunity ID
25-R0020
Version
1
Response Deadline
April 10, 2025
Past Due
Date Posted
Feb. 27, 2025
Source
Est. Value Range
Experimental
$2,000,000 - $5,000,000
(AI estimate)
Agency Distribution
Low
On 2/27/25 Myrtle Beach in South Carolina issued Exterior Renovations at Myrtle Beach Convention Center with ID 25-R0020 due 4/10/25.
Contacts
Documents
Posted documents for Exterior Renovations at Myrtle Beach Convention Center
Opportunity Assistant
AI Analysis
AI Generate