RIDOT: Design-Build Bridge Group 95-Route 4/I-95 Interchange-Route 403 Ramps
ID: TRFP24004331
• State: Rhode Island
Opportunity Assistant
Loading
Description
Background
The Rhode Island Department of Transportation (RIDOT) is soliciting improvements to the Route 4/Route 1-95 Interchange and Route 403 ramps. The nature of the improvements at this location is to provide the 'missing movements' at the Route 4/1-95 interchange in the form of two new ramps; one connecting Route 4 northbound to 1-95 southbound (Ramp NW) including a new bridge over 1-95 northbound & southbound, and the other connecting 1-95 northbound to Route 4 southbound (Ramp ES). The Route 4/1-95 interchange location also includes modifications to the intersection of Route 2 (Quaker Lane) at the 1-95 southbound ramps including the full replacement of the traffic signal.
Work Details
The work involves providing improvements to the Route 4/Route 1-95 Interchange and Route 403 ramps. This includes constructing two new ramps, one connecting Route 4 northbound to 1-95 southbound (Ramp NW) with a new bridge over 1-95 northbound & southbound, and the other connecting 1-95 northbound to Route 4 southbound (Ramp ES). Additionally, modifications to the intersection of Route 2 (Quaker Lane) at the 1-95 southbound ramps are required, including the full replacement of the traffic signal.
Period of Performance
The contract will begin approximately in December 2024 and Substantial Completion is expected by August 24, 2027.
Place of Performance
The project will be performed at the Route 4/Route 1-95 Interchange and Route 403 ramps in Rhode Island.
The Rhode Island Department of Transportation (RIDOT) is soliciting improvements to the Route 4/Route 1-95 Interchange and Route 403 ramps. The nature of the improvements at this location is to provide the 'missing movements' at the Route 4/1-95 interchange in the form of two new ramps; one connecting Route 4 northbound to 1-95 southbound (Ramp NW) including a new bridge over 1-95 northbound & southbound, and the other connecting 1-95 northbound to Route 4 southbound (Ramp ES). The Route 4/1-95 interchange location also includes modifications to the intersection of Route 2 (Quaker Lane) at the 1-95 southbound ramps including the full replacement of the traffic signal.
Work Details
The work involves providing improvements to the Route 4/Route 1-95 Interchange and Route 403 ramps. This includes constructing two new ramps, one connecting Route 4 northbound to 1-95 southbound (Ramp NW) with a new bridge over 1-95 northbound & southbound, and the other connecting 1-95 northbound to Route 4 southbound (Ramp ES). Additionally, modifications to the intersection of Route 2 (Quaker Lane) at the 1-95 southbound ramps are required, including the full replacement of the traffic signal.
Period of Performance
The contract will begin approximately in December 2024 and Substantial Completion is expected by August 24, 2027.
Place of Performance
The project will be performed at the Route 4/Route 1-95 Interchange and Route 403 ramps in Rhode Island.
Overview
Agency
Opportunity Type
TRFP
Opportunity ID
TRFP24004331
Response Deadline
Oct. 17, 2024
Past Due
Date Posted
May 31, 2024
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.
Est. Value Range
Experimental
$50,000,000 - $100,000,000
(AI estimate)
Agency Distribution
High
On 5/31/24 State of Rhode Island in Rhode Island issued TRFP RIDOT: Design-Build Bridge Group 95-Route 4/I-95 Interchange-Route 403 Ramps with ID TRFP24004331 due 10/17/24.
Contacts
Documents
Posted documents for RIDOT: Design-Build Bridge Group 95-Route 4/I-95 Interchange-Route 403 Ramps
Opportunity Assistant
AI Analysis
AI Generate
Classifications
NAICS
PSC
UNSPSC
72000000 - Building and Facility Construction and Maintenance Services
Additional Details
Who Can Respond
All Vendors