Search Contract Opportunities

RIC Construction of Cyber Security Range at Alger Hall

ID: RFQ25004830 • State: Rhode Island

Description

Rhode Island College is seeking a vendor to complete interior demo including but not limited to electrical, mechanical, ceiling, and partition wall of the existing computer labs 101 and 102 in Alger Hall. Computer Lab 101 will be renovated to be a standard multipurpose computer lab. Computer Lab 102 will be renovated to be a Cyber Range with advance equipment and lightning. A brand-new HVAC system will be installed to service both rooms. New electrical systems, AV and networking, and additional wiring to be installed. New ceiling, partition wall, and AV closet to be installed. See Construction Drawings and specs for full details. Prebid: October 30, 2024, 9:00 AM - Rhode Island College, 600 Mt Pleasant Ave, providence, RI. Visitor Center (building 45) Room 402 (see campus Map)
Background
Rhode Island College is seeking a vendor to complete the renovation of existing computer labs 101 and 102 in Alger Hall. The mission of this project is to transform Lab 101 into a standard multipurpose computer lab and Lab 102 into a Cyber Range equipped with advanced technology. This initiative aligns with the college's goal to enhance its educational facilities and provide state-of-the-art resources for students and faculty.

Work Details
The contract includes interior demolition and construction services, specifically:
- Demolition of electrical and mechanical systems, ceiling, and partition walls in Labs 101 and 102.
- Renovation of Computer Lab 101 into a multipurpose lab.
- Renovation of Computer Lab 102 into a Cyber Range with advanced equipment and lighting.
- Installation of a new HVAC system servicing both labs.
- Installation of new electrical systems, audio-visual (AV) systems, networking infrastructure, and additional wiring.
- Installation of new ceilings, partition walls, and an AV closet.
Refer to the Construction Drawings and specifications for detailed requirements.

Period of Performance
The initial contract period will commence in December 2024 for one year, with potential renewal for an additional year based on performance and funding availability. Construction is expected to start immediately upon receipt of the purchase order, with substantial completion targeted for Spring 2025 and final completion within 15 days thereafter.

Place of Performance
The work will be performed at Rhode Island College, specifically in Alger Hall located at 600 Mt Pleasant Ave, Providence, RI.

Overview

Opportunity Type
RFQ
Opportunity ID
RFQ25004830
Version
1
Response Deadline
Nov. 22, 2024 Past Due
Date Posted
Oct. 18, 2024
Est. Value Range
Experimental
$500,000 - $1,500,000 (AI estimate)
Agency Distribution
High
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.
On 10/18/24 State of Rhode Island in Rhode Island issued RFQ RIC Construction of Cyber Security Range at Alger Hall with ID RFQ25004830 due 11/22/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for RIC Construction of Cyber Security Range at Alger Hall

Additional Details

Who Can Respond
All Vendors

Similar Active Opportunities