Search Contract Opportunities

Electric Vehicle Charging Station Installation PA Lumber Museum, Potter County, PA

ID: FDC-100-11334.4R • State: Pennsylvania
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

Background
The Commonwealth of Pennsylvania's Department of Conservation and Natural Resources is issuing a contract for the installation of electric vehicle (EV) charging stations at the PA Lumber Museum located in Potter County, Pennsylvania. The goal of this contract is to enhance the infrastructure for electric vehicles within the state park, aligning with broader environmental and sustainability initiatives.

Work Details
The work under this project includes:

1) Providing and installing two (2) EV charging stations;

2) New feeder circuits from the existing Main Distribution Panel;

3) Trenching, backfilling, and underground conduit systems for feeder circuits;

4) Installation of all related equipment including meters, panel branch circuit breakers, boxes, connectors, conduit, and wiring;

5) Concrete footer foundations for EV charging station pedestals;

6) Creation of two (2) new EV parking spaces with a center access aisle;

7) Installation of two (2) removable bollards for the access aisle;

8) Finish grading and line painting for parking spaces;

9) Start-up, commissioning, and training on the use of the charging stations.

Period of Performance
The contract will commence upon receipt of the necessary permits and is expected to be completed within a specified timeframe as outlined in the contract documents.

Place of Performance
The work will be performed at the PA Lumber Museum located at 5660 US Route 6 West, Ulysses Township, Potter County, Pennsylvania.

Bidder Requirements
Bidders must comply with specific requirements including: no more than forty-nine percent (49%) of the work may be subcontracted without written approval from the Department. The contractor must possess a valid Uniform Construction Code (UCC) Building Permit issued by the PA Department of Labor & Industry prior to commencing work.
Loading Map
Loading Map

Overview

Opportunity ID
FDC-100-11334.4R
Response Deadline
June 11, 2026 Due in 10 Days
Date Posted
May 13, 2026
Source

Est. Value Range
Experimental
$90,000 - $180,000 (AI estimate)
Agency Distribution
Low
On 5/13/26 Pennsylvania Department of Conservation and Natural Resources in Pennsylvania issued Electric Vehicle Charging Station Installation PA Lumber Museum, Potter County, PA with ID FDC-100-11334.4R due 6/11/26.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Electric Vehicle Charging Station Installation PA Lumber Museum, Potter County, PA

Opportunity Assistant


AI Analysis

AI Generate

Classifications

Similar Active Opportunities