Blue/Green Connector Trail Improvements - Phase 1
ID: PennBid: 198436
• State: Pennsylvania
Opportunity Assistant
Loading
Description
Background
The Blue/Green Connector Trail Improvements – Phase 1 project is owned by the Little Conestoga Creek Foundation. It aims to enhance the trail system and associated stormwater management facilities in East Hempfield Township, Pennsylvania. This project is part of a larger initiative to improve the Little Conestoga Creek Corridor, focusing on environmental sustainability and community accessibility.
Work Details
The project involves the construction of a trail with associated stormwater management (SWM) facilities. Key components include:
1) One at-grade basin located in the southeastern portion of the site;
2) A thickened stone base beneath the proposed trail for stormwater management;
3) Excavation of nine test pits and corresponding infiltration tests to characterize subsurface conditions;
4) Recommendations for stormwater management facilities including design infiltration rates not exceeding 1.00 in/hr;
5) Construction of embankments with side slopes of 3(H):1(V) or flatter;
6) Implementation of a clay core in embankment structures with specific material requirements;
7) Compliance with Pennsylvania Prevailing Wage Rate requirements; and
8) Considerations for karst geology and sinkhole risks during construction.
Period of Performance
The contract period is expected to commence upon award and continue through the completion of construction activities, with specific timelines for various phases outlined in project documentation.
Place of Performance
The geographic location for this contract is East Hempfield Township, Pennsylvania, specifically at approximately 1776 Harrisburg Pike.
Bidder Requirements
Bidders must comply with several requirements including:
- Submission of a Bid Bond or certified check for 10% of the total base bid;
- Adherence to Pennsylvania's Public Works Employment Verification Act;
- Submission of a Non-Collusion Affidavit; and
- Confirmation that all workers are lawfully permitted to work in the United States.
Additionally, contractors are encouraged to solicit bids from Minority-owned, Women-owned, and Disadvantaged business enterprises.
The Blue/Green Connector Trail Improvements – Phase 1 project is owned by the Little Conestoga Creek Foundation. It aims to enhance the trail system and associated stormwater management facilities in East Hempfield Township, Pennsylvania. This project is part of a larger initiative to improve the Little Conestoga Creek Corridor, focusing on environmental sustainability and community accessibility.
Work Details
The project involves the construction of a trail with associated stormwater management (SWM) facilities. Key components include:
1) One at-grade basin located in the southeastern portion of the site;
2) A thickened stone base beneath the proposed trail for stormwater management;
3) Excavation of nine test pits and corresponding infiltration tests to characterize subsurface conditions;
4) Recommendations for stormwater management facilities including design infiltration rates not exceeding 1.00 in/hr;
5) Construction of embankments with side slopes of 3(H):1(V) or flatter;
6) Implementation of a clay core in embankment structures with specific material requirements;
7) Compliance with Pennsylvania Prevailing Wage Rate requirements; and
8) Considerations for karst geology and sinkhole risks during construction.
Period of Performance
The contract period is expected to commence upon award and continue through the completion of construction activities, with specific timelines for various phases outlined in project documentation.
Place of Performance
The geographic location for this contract is East Hempfield Township, Pennsylvania, specifically at approximately 1776 Harrisburg Pike.
Bidder Requirements
Bidders must comply with several requirements including:
- Submission of a Bid Bond or certified check for 10% of the total base bid;
- Adherence to Pennsylvania's Public Works Employment Verification Act;
- Submission of a Non-Collusion Affidavit; and
- Confirmation that all workers are lawfully permitted to work in the United States.
Additionally, contractors are encouraged to solicit bids from Minority-owned, Women-owned, and Disadvantaged business enterprises.
Overview
Opportunity Type
ITB
Opportunity ID
PennBid: 198436
Response Deadline
Aug. 29, 2025
Past Due
Date Posted
Aug. 15, 2025
Source
Est. Value Range
Experimental
$500,000 - $1,500,000
(AI estimate)
Agency Distribution
High
On 8/15/25 Little Conestoga Creek Foundation, East Hempfield Township, Lancaster County in Pennsylvania issued ITB Blue/Green Connector Trail Improvements - Phase 1 with ID PennBid: 198436 due 8/29/25.
Contacts
Documents
Posted documents for Blue/Green Connector Trail Improvements - Phase 1
Opportunity Assistant
AI Analysis
AI Generate
Classifications
Additional Details
Questions Due
08/27/2025