Background
The City of Pendleton, Oregon, is seeking bids for the upgrade of the HVAC system at the Vert Auditorium. This project aims to enhance the heating and cooling capabilities of the facility, ensuring a comfortable environment for events and activities held there. The Facilities Department is managing this project, which is scheduled to commence in October 2024.
Work Details
The work includes the furnishing and installation of two RUUD rooftop gas heat/electric cool packaged units (model RGEG2T180) with a single thermostat. This installation will encompass all necessary duct work, gas piping, and electrical work. The units will be placed on the roof of the 'Green Room'.
Additionally, three Daikin Multi Port Ductless Heat Pump systems will be installed to serve restrooms and the main entryway of the Vert Auditorium. The contractor must provide all penetrations, equipment for lifting/installing heating units, and removal of existing equipment. All materials, labor, and permits required to complete this work must be supplied by the contractor.
Period of Performance
The contract performance period begins upon award and is expected to be completed by March 15, 2025.
Place of Performance
The work will be performed at Vert Auditorium located at 480 SW Dorion Avenue, Pendleton, Oregon.
The City of Pendleton, Oregon, is seeking bids for the upgrade of the HVAC system at the Vert Auditorium. This project aims to enhance the heating and cooling capabilities of the facility, ensuring a comfortable environment for events and activities held there. The Facilities Department is managing this project, which is scheduled to commence in October 2024.
Work Details
The work includes the furnishing and installation of two RUUD rooftop gas heat/electric cool packaged units (model RGEG2T180) with a single thermostat. This installation will encompass all necessary duct work, gas piping, and electrical work. The units will be placed on the roof of the 'Green Room'.
Additionally, three Daikin Multi Port Ductless Heat Pump systems will be installed to serve restrooms and the main entryway of the Vert Auditorium. The contractor must provide all penetrations, equipment for lifting/installing heating units, and removal of existing equipment. All materials, labor, and permits required to complete this work must be supplied by the contractor.
Period of Performance
The contract performance period begins upon award and is expected to be completed by March 15, 2025.
Place of Performance
The work will be performed at Vert Auditorium located at 480 SW Dorion Avenue, Pendleton, Oregon.
Overview
Agency
Opportunity ID
086bb
Response Deadline
Nov. 19, 2024
Past Due
Date Posted
Oct. 23, 2024
Est. Value Range
Experimental
$150,000 - $300,000
(AI estimate)
Agency Distribution
Low
Source
On 10/23/24 City of Pendleton in Oregon issued Vert Auditorium HVAC System Upgrade with ID 086bb due 11/19/24.