Swan Island Combined Sewer Overflow (SICSO) Pump Station Pumps 1, 3 and 5 Improvements
ID: 00002510
• State: Oregon
Opportunity Assistant
Loading
Description
Background
The City of Portland is issuing a contract for the Swan Island Combined Sewer Overflow (SICSO) Pump Station Pumps 1, 3 and 5 Improvements. The project aims to enhance the existing pump station infrastructure to improve sewage management and environmental compliance. The total estimated cost for this project is $2,100,000, with additional requirements for specialty welding and pipeline fabrication.
Work Details
The work includes the construction of custom field fit and welded rigid pipe spools to replace three horizontal and three vertical existing bellows couplings. Additionally, the project involves the installation of new or modified pipe system supports and motor base plate systems. Contractors must be prequalified in two categories: Sewage Pumping Stations for $2,100,000 and Boiler Making/Steam Fitting/Pipeline Fabrication for $500,000. Each specialty welder must have at least eleven years of verifiable experience in relevant projects and be a member in good standing with a recognized union. The contractor must provide all necessary welding tools and commit to using at least two qualified specialty welders.
Period of Performance
The contract work is expected to commence upon award and must be completed within a specified timeframe following the start date. The submission deadline for prequalification applications is set for March 11, 2025.
Place of Performance
The work will take place at the Swan Island Combined Sewer Overflow Pump Station located in Portland, Oregon.
The City of Portland is issuing a contract for the Swan Island Combined Sewer Overflow (SICSO) Pump Station Pumps 1, 3 and 5 Improvements. The project aims to enhance the existing pump station infrastructure to improve sewage management and environmental compliance. The total estimated cost for this project is $2,100,000, with additional requirements for specialty welding and pipeline fabrication.
Work Details
The work includes the construction of custom field fit and welded rigid pipe spools to replace three horizontal and three vertical existing bellows couplings. Additionally, the project involves the installation of new or modified pipe system supports and motor base plate systems. Contractors must be prequalified in two categories: Sewage Pumping Stations for $2,100,000 and Boiler Making/Steam Fitting/Pipeline Fabrication for $500,000. Each specialty welder must have at least eleven years of verifiable experience in relevant projects and be a member in good standing with a recognized union. The contractor must provide all necessary welding tools and commit to using at least two qualified specialty welders.
Period of Performance
The contract work is expected to commence upon award and must be completed within a specified timeframe following the start date. The submission deadline for prequalification applications is set for March 11, 2025.
Place of Performance
The work will take place at the Swan Island Combined Sewer Overflow Pump Station located in Portland, Oregon.
Loading Map
Loading Map
Overview
Opportunity Type
Open Market
Opportunity ID
00002510
Version
1
Response Deadline
April 8, 2025
Past Due
Date Posted
Feb. 10, 2025
Source
Pre-Bid Conference
MANDATORY PREBID MEETING
February 18, 2025 at 11:30 AM
To be held at: 4199 N Port Center Way, Portland OR 97217
Est. Value Range
Experimental
$500,000 - $2,100,000
(AI estimate)
Agency Distribution
Moderate
On 2/10/25 CONSTRUCTION - Construction in Oregon issued Open Market Swan Island Combined Sewer Overflow (SICSO) Pump Station Pumps 1, 3 and 5 Improvements with ID 00002510 due 4/8/25.
Contacts
Documents
Posted documents for Swan Island Combined Sewer Overflow (SICSO) Pump Station Pumps 1, 3 and 5 Improvements
Opportunity Assistant
AI Analysis
AI Generate
Additional Details
Source Department
CONSTRUCTION - Construction