Power Washing, Painting, Sealing, and Caulking of the exterior walls of the Washington County Parking Structure
ID: 2024.038-ITB Services • State: Oregon
Opportunity Assistant
Loading
Description
Background
Washington County Department of Facilities, Fleet and Park services is requesting bids from qualified contractors to pressure wash all exterior horizontal and vertical surfaces of the Washington County Parking Structure located at 225 S First Avenue, Hillsboro, Oregon. The parking structure has moss, grease, dirt, grime and all other surfaces that have built up. The project will also incorporate new caulking, exterior paint, and sealing of the concrete exterior façade.
The 5-floor parking structure was erected in 1997-98 and consumes an area roughly 306 feet long, 129 feet wide, and an elevation of roughly 50 feet. In addition, the parking structure provides 488 parking spots, 2 elevators, houses a conference center, several perimeter offices, and serves the numerous TriMet passengers 7 days a week.
Work Details
The scope of work includes pressure washing all exterior horizontal and vertical surfaces to remove grime, dirt, oils, surface build-up, and moss prior to painting. The contractor must coordinate with the Contract Administrator when scheduling power washing over business entries to ensure public safety.
They are responsible for obtaining permits for right of way usage and sidewalk closures from the city of Hillsboro and Washington County. Additionally, the contractor must provide high-visibility signage for pedestrian safety and properly contain any oil or fuel leakage on the property.
All necessary equipment to safely reach and access upper areas of the parking structure for requested work must be provided by the contractor.
Period of Performance
The project timeline includes a pre-proposal meeting on March 7, 2024 (non-mandatory), with a question submission deadline on March 15, 2024. The proposal submission deadline is March 21, 2024 at 2:00 pm.
Place of Performance
The work will be performed at the Washington County Parking Structure located at 225 S First Avenue, Hillsboro, Oregon.
Washington County Department of Facilities, Fleet and Park services is requesting bids from qualified contractors to pressure wash all exterior horizontal and vertical surfaces of the Washington County Parking Structure located at 225 S First Avenue, Hillsboro, Oregon. The parking structure has moss, grease, dirt, grime and all other surfaces that have built up. The project will also incorporate new caulking, exterior paint, and sealing of the concrete exterior façade.
The 5-floor parking structure was erected in 1997-98 and consumes an area roughly 306 feet long, 129 feet wide, and an elevation of roughly 50 feet. In addition, the parking structure provides 488 parking spots, 2 elevators, houses a conference center, several perimeter offices, and serves the numerous TriMet passengers 7 days a week.
Work Details
The scope of work includes pressure washing all exterior horizontal and vertical surfaces to remove grime, dirt, oils, surface build-up, and moss prior to painting. The contractor must coordinate with the Contract Administrator when scheduling power washing over business entries to ensure public safety.
They are responsible for obtaining permits for right of way usage and sidewalk closures from the city of Hillsboro and Washington County. Additionally, the contractor must provide high-visibility signage for pedestrian safety and properly contain any oil or fuel leakage on the property.
All necessary equipment to safely reach and access upper areas of the parking structure for requested work must be provided by the contractor.
Period of Performance
The project timeline includes a pre-proposal meeting on March 7, 2024 (non-mandatory), with a question submission deadline on March 15, 2024. The proposal submission deadline is March 21, 2024 at 2:00 pm.
Place of Performance
The work will be performed at the Washington County Parking Structure located at 225 S First Avenue, Hillsboro, Oregon.
Overview
Agency
Opportunity ID
2024.038-ITB Services
Response Deadline
March 21, 2024
Past Due
Date Posted
Feb. 28, 2024
Agency Distribution
Moderate
Source
On 2/28/24 Facilities in Oregon issued Power Washing, Painting, Sealing, and Caulking of the exterior walls of the Washington County Parking Structure with ID 2024.038-ITB Services due 3/21/24.
Contacts
Documents
Posted documents for Power Washing, Painting, Sealing, and Caulking of the exterior walls of the Washington County Parking Structure
Opportunity Assistant
AI Analysis
AI Generate