ESB 2024 D7 OR38 MP 23.3 (Weatherly Creek) Access Control Gate Installations
ID: S-73000-00011759 • State: Oregon
Opportunity Assistant
Loading
Description
Background
The Oregon Department of Transportation (ODOT) is issuing this Request for Competitive Quotes for the installation of access control gates at two access points along OR38 at MP 23.3, specifically at the Weatherly Creek Stockpile Site in Douglas County, Oregon.
The project aims to enhance security and control access to the site as part of ODOT's mission to maintain safe and efficient transportation systems.
Work Details
The contractor will be responsible for installing state-furnished access control gates at two designated access points along OR38 at MP 23.3. The scope of work includes:
1. Providing and maintaining temporary work zone traffic control.
2. Installing state-furnished access control gates at the specified locations.
3. Performing additional incidental work as directed in the contract plans and specifications.
4. Excavating minimum 20-inch diameter concrete footings to ensure proper embedment of gate posts.
5. Setting furnished posts in the center of the holes and placing concrete footings while bracing posts during curing.
6. Coordinating utility locates and removing spoils from excavation work unless otherwise allowed.
Period of Performance
The period of performance for this contract is from the date of award until substantial completion on June 2, 2025, with final completion expected by August 2, 2025.
Place of Performance
The work will be performed at the Weatherly Creek Stockpile Site located along OR38 at MP 23.3 in Douglas County, Oregon.
The Oregon Department of Transportation (ODOT) is issuing this Request for Competitive Quotes for the installation of access control gates at two access points along OR38 at MP 23.3, specifically at the Weatherly Creek Stockpile Site in Douglas County, Oregon.
The project aims to enhance security and control access to the site as part of ODOT's mission to maintain safe and efficient transportation systems.
Work Details
The contractor will be responsible for installing state-furnished access control gates at two designated access points along OR38 at MP 23.3. The scope of work includes:
1. Providing and maintaining temporary work zone traffic control.
2. Installing state-furnished access control gates at the specified locations.
3. Performing additional incidental work as directed in the contract plans and specifications.
4. Excavating minimum 20-inch diameter concrete footings to ensure proper embedment of gate posts.
5. Setting furnished posts in the center of the holes and placing concrete footings while bracing posts during curing.
6. Coordinating utility locates and removing spoils from excavation work unless otherwise allowed.
Period of Performance
The period of performance for this contract is from the date of award until substantial completion on June 2, 2025, with final completion expected by August 2, 2025.
Place of Performance
The work will be performed at the Weatherly Creek Stockpile Site located along OR38 at MP 23.3 in Douglas County, Oregon.
Overview
Opportunity Type
Open Market
Pre-Bid Conference
None.
Opportunity ID
S-73000-00011759
Response Deadline
Oct. 21, 2024
Past Due
Date Posted
Oct. 7, 2024
Est. Value Range
Experimental
$50,000 - $150,000
(AI estimate)
Agency Distribution
High
Source
On 10/7/24 Department of Transportation in Oregon issued Open Market ESB 2024 D7 OR38 MP 23.3 (Weatherly Creek) Access Control Gate Installations with ID S-73000-00011759 due 10/21/24.
Contacts
Documents
Posted documents for ESB 2024 D7 OR38 MP 23.3 (Weatherly Creek) Access Control Gate Installations
Opportunity Assistant
AI Analysis
AI Generate
Classifications
Opportunity Classification
3200 - Main Dist 7 ADM
Additional Details
Source Department
7304230 - Region 3