Search Contract Opportunities

District Three Boat Building Ceiling & HVAC

ID: SRC0000030894 • State: Ohio
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Summarize the work to be completed under this opportunity
Does this solicitation list any subcontracting requirements?
List any requirements necessary to complete this contract
I'd like to anonymously submit a question to the procurement officer(s)
Loading
Get Real Time Alerts from 40k+ Federal, State and Local Agencies
Find Now

Description

The Division of Wildlife is seeking bids for (1) the installation of an interior metal ceiling, including ceiling insulation, inside a three-bay storage building (43' width x 31'-6 depth ceiling dimensions; ~1,375 sq-ft) and (2) the installation of a new, propane-compatible, ceiling-hung furnace appropriate to the space. The HVAC work shall be completed by a licensed HVAC contractor with the state of Ohio. Subcontractors are allowed.
Background
The Division of Wildlife, part of the State of Ohio, is seeking bids for the installation of an interior metal ceiling and HVAC system in a three-bay storage building located at 912 Portage Lakes Drive, Akron, OH. The goal of this contract is to enhance the facility's heating capabilities and improve its overall functionality for wildlife management operations.

Work Details
The work is divided into two main components:

1) Installation of an interior metal ceiling (approximately 1,375 sq-ft) including insulation. The ceiling panels must be a white-painted steel liner panel with a thickness of 26-gauge or thicker. Panels are to be affixed using screw-in fasteners, and appropriate trim beads or moldings will be used for finishing edges. Adjustments may be needed for existing electrical fixtures and NM-B cables. An access door/panel (approximately 2' x 4') will also be installed for HVAC access. Insulation must be unfaced rockwool with R-values of R-38 or higher.

2) Installation of a propane-compatible ceiling-hung furnace rated at no less than 100,000 BTU, capable of heating the entire space evenly. The contractor must run a dedicated electrical circuit from the breaker panel to the furnace location, approximately 60-75 feet in length, which includes providing the correct breaker and conduit.

Period of Performance
The contract work is to be completed by August 29, 2025.

Place of Performance
912 Portage Lakes Drive, Akron, OH 44319.

Bidder Requirements
Bidders must use licensed HVAC contractors registered in Ohio. All materials provided must be new and not reused or recycled. Vendors are required to obtain necessary permits from The Ohio Department of Commerce and ensure compliance with all applicable laws.

Overview

Opportunity ID
SRC0000030894
Response Deadline
June 13, 2025 Past Due
Date Posted
May 13, 2025
Est. Value Range
Experimental
$20,000 - $50,000 (AI estimate)
Agency Distribution
High
Source
On 5/13/25 DNR750530 District 3-Fish Management DNRSUM in Ohio issued District Three Boat Building Ceiling & HVAC with ID SRC0000030894 due 6/12/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for District Three Boat Building Ceiling & HVAC

Additional Details

Set Aside
MBE Set Aside
Lot #
1
Round #
1
Inquiry End Date
6/11/2025 5:00:00 PM

Similar Active Opportunities