Search Contract Opportunities

Weiskotten Hall Addition (WHA) Electrical Equipment Upgrades

ID: 2115055 • State: New York

Description

The State University of New York at Upstate Medical University will receive sealed bids for Project Number 151006/685.7 Titled Weiskotten Hall Addition (WHA) Electrical Equipment Upgrades until 2:00 p.m. local time on Thursday, December 12, 2024 at:

Delivered to:

Mrs. Shawna Frigon/Ms. Ivy Lopez

Contracts & Campus Purchasing

SUNY Upstate Medical University

Dr. Sarah Loguen Center, 2nd floor

650 South Salina Street, Room 2048

Syracuse, New York 13202

where such proposals will be publicly opened and read aloud. Proposals may be hand delivered or mailed to the above location and must be received at such time.

Scope of work is to include all necessary labor, material, and equipment for the Weiskotten Hall Addition (WHA) Electrical Equipment Upgrades.

The main features of the work shall include, but not be limited to the following:

Electrical:

  • Replacement and modernization of existing electrical infrastructure in the Weiskotten Hall Addition (WHA), NAB and Sliverman Buildings.
  • In WHA replace 5kV MV switches (SS#4, SS#5, SS#6 & NAB) with new S&C custom switchgear with VISTA distributions SSVS-1' & SSVS-2', extension of existing 5kV MV feeders, replacement of step-down transformers (SS#4, SS#5 & SS#6) with new and associated HVLcc switches.
  • In WHA replace existing 120/208V and 277/480V switchgear with new 120/208V, 4000A, 3-Phase, 4-Wire and 277/480V, 4000A, 3-Phase, 4-Wire Main-Tie-Main switchgear equipment.
  • Furnish and install new step-down transformer SS#7 to supply one side of Main-Tie-Main 120/208V switchgear.
  • In WHA furnish and install new 800A automatic transfer switch to replace existing allowing for space to install new electrical switchgear equipment.
  • In WHA replace existing circuit breaker in emergency distribution board serving fire pump with new 800A.
  • In WHA replace distribution panels DLR', PP5', DVR', EDN, DPNR', DER', DPMR', DPSR', EDS' with new.
  • Furnish and install normal and emergency conduit system with associated wiring between electric MV, 120/208V, 277/480V switchgear, distribution boards, ATS, panelboards, etc.
  • In WHA replace existing vertical aluminum riser conductors with copper utilizing existing wire troughs.
  • In WHA furnish and install feeders, panels and equipment in electrical closets on upper floors.
  • In manhole MH-NA eliminate existing splice serving Clark Hall, Campus Activity and Jacobsen Hall buildings and supply them from new SSVS-1 MV distribution.
  • In NAB building replace existing 5kV switch with new duplex HVLcc switch and install new 5kV feeders from SSVS-1 and SSVS-2 MV distributions in WHA. New duplex HVLcc shall supply existing 1000kVA step-down transformer.
  • For Silverman building, install new 5kV feeder from SSVS-2 in WHA, 750kVA outdoor pad mount step-down transformer and new distribution board to supply existing loads in the building.
  • Provide temporary distribution boards, panelboards, feeders, etc. as indicated on the design documents.
  • Schedule all outages with Upstate Medical University.
  • Provide temporary power to areas affected by power interruptions
  • Transfer feeders to new distribution as called for on contract documents.
  • Installation and removal of temporary required to maintain full functionality of the building during feeder cut overs and outages.

General Construction:

  • Selective demolition of existing walls floors and site work. The contractor will be responsible for coordinating all work indicated on contract documents with owner and SUCF.
  • Construction of new 2-hour rated partitions, doors and soffits as indicated on the design documentation.

Structural:

  • Construction of new supports for conduit banks.
  • Construction of new concrete pads for floor mount electrical equipment.
  • Construction of new outdoor transformer pad to supply Silverman building.

Asbestos Abatement:

  • Abatement of sheetrock with ACM joint compound and disposal of presumed asbestos containing electrical equipment.

All work on this Contract is to be completed within 180 days after the date of the Notice to Proceed.

Complete sets of Contract Documents for bidding may be examined free of charge at the campus and at the following locations.

SUNY Upstate, Design and Construction, 650 South Salina Street, 2nd floor, Syracuse,

NY 13202.

Complete sets of Contract Documents for bidding may ONLY be obtained from: Syracuse Blueprint Company, Inc., 825 East Genesee Street, Syracuse, NY 13210, Attn: Karen Johnson, E-mail: kjohnson@syracuseblueprint.com, Ph. (315) 476-4084, FAX: (315) 476-7578,

Section 143 of the State Finance Law requires payment of a deposit to receive these documents. Accordingly, a deposit check of $49.50 made payable to SUNY Upstate Medical University, is required. Deposits less than $50.00 are nonrefundable. Deposits will be waived for certified Minority and Women Owned and Service-Disabled Veteran Owned Businesses.

A pre-bid conference and project walk-through will be held on Friday, November 15, 2024, at 10:00 AM with all contractors assembled at the Main Lobby of Weiskotten Hall, 766 Irving Ave, Syracuse, New York.

Effective 1/1/06, in accordance with State Finance Law Section 139-j, all questions pertaining to the solicitation shall be made formally to the designated contact in Contracts & Campus Purchasing: Mrs. Shawna Frigon & Ms. Ivy Lopez SUNY - Upstate Medical University, 750 East Adams Street, Syracuse, New York 13210, Phone: (315) 464-5874 (315) 464-4595 Fax: (315) 464-4679, PM: Rod Parks, Phone (315) 464-7365 and Consultant: Lizardos Engineering Associates, PC Mechanical & Electrical Engineering, Kevin Zheng, Phone: (516) 484-1020, X259. Contact made to other staff regarding this procurement may disqualify the firm and affect future procurements with government entities in the State of New York. Please refer to the OGS' (www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil.html) for more information on this law.

All questions pertaining to the solicitation during the restricted period shall be made formally to each Designated Staff concurrently:

Contracting Staff:

Shawna Frigon

Contracts Administrator

Contracts & Campus Purchasing

SUNY - Upstate Medical University

750 East Adams Street

Syracuse, New York 13210

Phone: (315) 464- 4680

Email: FrigonS@upstate.edu

Project Manager

Rod Parks

Project Manager

Design and Construction

SUNY - Upstate Medical University

750 East Adams Street

Syracuse, New York 13210

Phone: (315) 382- 7365

Email: ParksR@upstate.edu

Consultant

Kevin Zheng

Electrical Engineer

Lizardos Engineering Associates

200 Old Country Road, Suite 670

Mineola, NY 11501

Phone (516) 484-1020, X-259

e-mail: Kevin.Zheng@lizardos.com

Bids must be submitted in duplicate in accordance with the instructions contained in the Information for Bidders. Security will be required for each bid in an amount not less than five (5) percent of the Total Bid.

It is the policy of the State of New York and the State University of New York to encourage minority business enterprise participation in this project by contractors, subcontractors and suppliers, and all bidders are expected to cooperate in implementing this policy.

The State University of New York reserves the right to reject any or all bids.

Service-Disabled Veteran-Owned Set Aside: No

Minority Owned Sub-Contracting Goal: 15%

Women Owned Sub-Contracting Goal: 15%

Service-Disabled Veteran-Owned Business Contracting Goal: 6%

Due date:12/12/2024 2:00 PM

Eastern Standard Time

Contract term: 180 Calendar Days

County(ies): All NYS counties

Location: 750 East Adams Street

Business entities awarded an identical or substantially similar procurement contract within the past five years:

RJ Ortlieb Murnane Building Contractors CBD C&S Companies GM Crisalli

Background
The State University of New York at Upstate Medical University is issuing a solicitation for Project Number 151006/685.7, titled Weiskotten Hall Addition (WHA) Electrical Equipment Upgrades.

The project aims to modernize and upgrade the electrical infrastructure within the Weiskotten Hall Addition and associated buildings, enhancing operational efficiency and safety.

Work Details
The scope of work includes all necessary labor, materials, and equipment for the electrical upgrades. Key tasks include:
- Replacement and modernization of existing electrical infrastructure in WHA, NAB, and Silverman Buildings.

- In WHA:
- Replace 5kV MV switches (SS#4, SS#5, SS#6 & NAB) with new S&C custom switchgear with VISTA distributions ‘SSVS-1’ & ‘SSVS-2’.
- Extend existing 5kV MV feeders and replace step-down transformers (SS#4, SS#5 & SS#6) with new units and associated HVLcc switches.
- Replace existing 120/208V and 277/480V switchgear with new Main-Tie-Main switchgear equipment.
- Install a new step-down transformer SS#7 for the Main-Tie-Main switchgear.
- Install an 800A automatic transfer switch to allow space for new electrical equipment.
- Replace circuit breaker in emergency distribution board serving fire pump with a new 800A unit.
- Replace various distribution panels with new units.
- Install normal and emergency conduit systems with wiring between switchgear, distribution boards, ATS, etc.
- Replace vertical aluminum riser conductors with copper in existing wire troughs.
- Furnish and install feeders, panels, and equipment in upper floor electrical closets.

- In NAB building:
- Replace existing 5kV switch with a duplex HVLcc switch and install new feeders from SSVS-1 and SSVS-2 MV distributions.

- For Silverman building:
- Install a new 5kV feeder from SSVS-2 in WHA along with a new outdoor pad mount step-down transformer.

- Provide temporary distribution boards as indicated in design documents.
- Schedule outages with Upstate Medical University and provide temporary power during interruptions.
- General construction includes selective demolition of walls/floors, construction of new rated partitions, supports for conduit banks, concrete pads for equipment, outdoor transformer pads, and asbestos abatement of sheetrock containing ACM joint compound.

Period of Performance
All work on this contract is to be completed within 180 days after the date of the Notice to Proceed.

Place of Performance
The contract will be performed at SUNY Upstate Medical University located at 750 East Adams Street, Syracuse, New York.

Overview

Opportunity Type
General
Opportunity ID
2115055
Response Deadline
Dec. 12, 2024 Past Due
Date Posted
Oct. 23, 2024
Est. Value Range
Experimental
$1,000,000 - $5,000,000 (AI estimate)
Agency Distribution
High
Source
Source Notes
Must be signed in to the New York Contract Reporter to view the opportunity.
On 10/23/24 State University of New York (SUNY) in New York issued General Weiskotten Hall Addition (WHA) Electrical Equipment Upgrades with ID 2115055 due 12/12/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Weiskotten Hall Addition (WHA) Electrical Equipment Upgrades

Classifications

Opportunity Classification
Construction Vertical: Building Construction; Rehabilitation & New Construction - Construction Professional Services

Similar Active Opportunities