Search Contract Opportunities

Replacement of the Theodore Fremd Retaining Wall

ID: 2112769 • State: New York
Real Time Relevant State, Local, and Education Bids from all 50 States
Find Now

Description

Work includes the installation of approximately 160 linear feet of soldier pile and lagging wall, 40 linear feet of MSES wall in two separate locations, a sidewalk with bridge railing atop a moment slab, sidewalk at-grade, curbs, and roadway signage and striping. Substantial utility involvement is expected from Con Edison and Westchester County DEF as major facilities owned by these two agencies are located within the project area and are to be maintained through construction.

The work includes all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in the specifications for PIN 8701.43 available at www.BidNetDirect.com/new-york/city-of-rye.

Service-Disabled Veteran-Owned Set Aside: No

Minority Owned Sub-Contracting Goal: 22.9%

Women Owned Sub-Contracting Goal: 6.9%

Disadvantaged Owned Sub-Contracting Goal: 9%

Due date:09/19/2024 3:00 PM

Questions due by 9/12/24 at 3:00 PM

Contract term: 240 days from Notice to Proceed

County(ies): Westchester

Location: Theodore Fremd Ave between Purchase Street and Locust Avenue

Business entities awarded an identical or substantially similar procurement contract within the past five years:

None

Background
The City of Rye, located in Westchester County, is issuing a solicitation for the replacement of the Theodore Fremd Avenue retaining wall. This project aims to enhance the structural integrity and safety of the roadway while addressing significant utility involvement from Con Edison and Westchester County DEF due to major facilities in the project area.

Work Details
The work includes the installation of approximately 160 linear feet of soldier pile and lagging wall, 40 linear feet of Mechanically Stabilized Earth System (MSES) wall at two separate locations, a sidewalk with bridge railing atop a moment slab, sidewalk at-grade, curbs, and roadway signage and striping.

The contractor is responsible for all labor, materials, machinery, tools, equipment, and other means necessary for the completion of the work as described in the specifications for PIN 8701.43. Substantial utility involvement is expected during construction.

Period of Performance
The contract term is set for 240 days from the Notice to Proceed.

Place of Performance
The work will be performed on Theodore Fremd Avenue between Purchase Street and Locust Avenue in Rye, Westchester County.

Overview

Opportunity Type
General
Opportunity ID
2112769
Response Deadline
Sept. 19, 2024 Past Due
Date Posted
Aug. 14, 2024
Est. Value Range
Experimental
$500,000 - $1,500,000 (AI estimate)
Agency Distribution
High
Source
Source Notes
Must be signed in to the New York Contract Reporter to view the opportunity.
On 8/14/24 Rye, City of in New York issued General Replacement of the Theodore Fremd Retaining Wall with ID 2112769 due 9/19/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Replacement of the Theodore Fremd Retaining Wall

Classifications

Opportunity Classification
Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction

Similar Active Opportunities