Description

Scope of Work Requested:

The project involves upgrading and providing emergency backup power to the remaining buildings on the Lehman College campus. The specific work includes:
  • Installation of a new 2500kW generator to support emergency loads for the Fine Arts building, Daycare building, Library, Concert Hall, Music, Speech & Theater, Gillet Hall, Science building, and Apex.
  • Connecting additional existing loads, currently on normal power, to the new generator system via optional standby Automatic Transfer Switches (ATS). These loads include:
    • Portions of the chiller and boiler plant
    • Assembly areas within the Apex building for emergency management
    • Data closets
    • Elevators
    • Pumps and mechanical systems in each building (to utilize steam for heating from the boiler plant)
    • Radio repeaters
    • Select research equipment not currently on backup power
  • Upgrading existing generator infrastructure in the listed buildings to meet current codes
  • Increasing capacity to connect both existing and future loads to the generator system

Requesting Entity:

This solicitation is issued by CUNY Lehman College.

Background:

This is Phase 2 of a campus-wide emergency power system upgrade at Lehman College. The goal is to ensure all major campus buildings have reliable emergency backup power and that the generator infrastructure is brought up to current standards.

Contract Requirements:
  • The estimated cost range for the scope of work is $15,000,000 - $15,500,000.
  • The successful low bidder must execute the Project Labor Agreement (PLA) included in the Contract Documents following the Form of Bid.
  • All subcontractors, at every tier, will be required to execute a Letter of Assent (included in the PLA) agreeing to be bound by the PLA's conditions.

Instructions on Submission:

This solicitation is for Expressions of Interest (EOI) only. Please refer to the Eligibility Requirements further down in the document for details on how to submit your EOI.
Loading Map
Loading Map

Overview

Opportunity Type
Requests for information (RFI) and Requests for Comment (RFC)
Opportunity ID
2134133
Response Deadline
May 15, 2026 Due in 22 Days
Date Posted
April 17, 2026
Est. Value Range
Experimental
$15,000,000 - $15,500,000 (AI estimate)
Agency Distribution
High
Source
Source Notes
Must be signed in to the New York Contract Reporter to view the opportunity.
On 4/17/26 Dormitory Authority of the State of New York in New York issued Requests for information (RFI) and Requests for Comment (RFC) CUNY Lehman College Campus Wide Emergency Power System Upgrade Phase 2 with ID 2134133 due 5/15/26.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Subscribe to search 5M+ historical and active solicitation documents

Free Trial Schedule Demo

Opportunity Assistant


Analyst Requests

AI Analysis

Classifications

Opportunity Classification
Construction Vertical: Building Construction; Rehabilitation & New Construction - Construction

Similar Active Opportunities