Docks and Breakwater Replacement at Canoe Point
ID: 2135714
• Alt ID: D006532
• State: New York
Opportunity Assistant
Loading
Description
Background
The New York State Office of Parks, Recreation and Historic Preservation (OPRHP) is issuing a solicitation for the Docks and Breakwater Replacement project at Canoe Point State Park located on Grindstone Island in Clayton, Jefferson County, New York. The agency's mission is to manage and protect the state's parks and recreational facilities while providing safe and enjoyable experiences for visitors.
The goal of this contract is to demolish existing structures and install new docks and breakwaters to enhance the park's infrastructure.
Work Details
The contractor will be responsible for the following tasks:
1. Demolition and disposal of existing docks and breakwater.
2. Installation of a new abutment including railing and gin pole assembly.
3. Construction of a gangway.
4. Installation of floating docks, including anchors and lines.
5. Provision of winches and anchorage systems.
6. Installation of a floating breakwater, including anchors and lines.
7. Placement of buoys, signs, and navigation lighting.
Period of Performance
The completion date for this project is set for 630 days after the agreement has been approved by the NYS Comptroller’s Office.
Place of Performance
Canoe Point State Park, Grindstone Island, Clayton, Jefferson County, New York.
Bidder Requirements
Bidders must meet the following requirements:
1. Minority Owned Business Enterprise (MBE) participation goal is set at 4%.
2. Women Owned Business Enterprise (WBE) participation goal is set at 12%.
3. Bidders must provide a digital copy of their company’s registration certificate with their bid as per NYS Labor Law Article 8 requirements effective December 30, 2024.
4. Bidders are required to maintain a written policy addressing gender-based violence in the workplace as per New York State Finance Law §139-M.
The New York State Office of Parks, Recreation and Historic Preservation (OPRHP) is issuing a solicitation for the Docks and Breakwater Replacement project at Canoe Point State Park located on Grindstone Island in Clayton, Jefferson County, New York. The agency's mission is to manage and protect the state's parks and recreational facilities while providing safe and enjoyable experiences for visitors.
The goal of this contract is to demolish existing structures and install new docks and breakwaters to enhance the park's infrastructure.
Work Details
The contractor will be responsible for the following tasks:
1. Demolition and disposal of existing docks and breakwater.
2. Installation of a new abutment including railing and gin pole assembly.
3. Construction of a gangway.
4. Installation of floating docks, including anchors and lines.
5. Provision of winches and anchorage systems.
6. Installation of a floating breakwater, including anchors and lines.
7. Placement of buoys, signs, and navigation lighting.
Period of Performance
The completion date for this project is set for 630 days after the agreement has been approved by the NYS Comptroller’s Office.
Place of Performance
Canoe Point State Park, Grindstone Island, Clayton, Jefferson County, New York.
Bidder Requirements
Bidders must meet the following requirements:
1. Minority Owned Business Enterprise (MBE) participation goal is set at 4%.
2. Women Owned Business Enterprise (WBE) participation goal is set at 12%.
3. Bidders must provide a digital copy of their company’s registration certificate with their bid as per NYS Labor Law Article 8 requirements effective December 30, 2024.
4. Bidders are required to maintain a written policy addressing gender-based violence in the workplace as per New York State Finance Law §139-M.
Loading Map
Loading Map
Overview
Opportunity Type
General
Opportunity ID
2135714
Response Deadline
July 1, 2026
Due in 16 Days
Date Posted
June 2, 2026
Source
Source Notes
Must be signed in to the New York Contract Reporter to view the opportunity.
Pre-Bid Conference
No pre-bid conference requirement found. The text provided refers to the bid opening only, which will be conducted via WebEx at https://meetny-gov.webex.com/meetny- at 1:30 p.m. local time on July 1, 2026.
Set Aside Preferences
Minority Owned
Woman Owned
Est. Value Range
Experimental
$1,200,000 - $3,200,000
(AI estimate)
Agency Distribution
High
On 6/2/26 Parks Recreation & Historic Preservation, NYS Office of in New York issued General Docks and Breakwater Replacement at Canoe Point with ID 2135714 due 7/1/26.
Contacts
Documents
Posted documents for Docks and Breakwater Replacement at Canoe Point
Opportunity Assistant
AI Analysis
AI Generate
Classifications
Opportunity Classification
Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction
NAICS