Search Contract Opportunities

Concrete Sidewalk Replacement at Lower Half Moon Park

ID: 2124768 • State: New York
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Summarize the work to be completed under this opportunity
Does this solicitation list any subcontracting requirements?
List any requirements necessary to complete this contract
I'd like to anonymously submit a question to the procurement officer(s)
Loading
Real Time Relevant State, Local, and Education Bids from all 50 States
Find Now

Description

Village of Piermont concrete sidewalk replacement at Half Moon lower park, Piermont , New York.

Service-Disabled Veteran-Owned Set Aside: No

Due date:08/14/2025 3:00 PM

Bid Opening at 3:15pm

Contract term: NA

County(ies): All NYS counties

Location: Lower Half Moon Park on Piermont Avenue

Business entities awarded an identical or substantially similar procurement contract within the past five years:

Not applicable

Background
The Village of Piermont is issuing a contract for the concrete sidewalk replacement at Lower Half Moon Park located along Piermont Avenue in Piermont, New York.
The project aims to enhance public infrastructure by replacing existing sidewalks and curbs to ensure safety and accessibility for park visitors.

Work Details
The project involves the removal of the existing concrete sidewalk and curb at Lower Half Moon Park and the installation of a new concrete sidewalk and cobblestone curb.
Specific tasks include:
1) Excavating to safely remove existing structures with minimal disturbance;
2) Installing a new cobblestone curb that matches existing curbing;
3) Laying a layer of 6-inch compacted gravel;
4) Installing welded wire mesh;
5) Pouring a new concrete sidewalk that is 4 inches thick, adhering to ACI requirements, with necessary expansion and control joints.
All materials must meet specified standards, including 4000 psi concrete, grade 60 reinforcing steel, and appropriate joint fillers.

Period of Performance
The contract work is expected to commence following the award of the contract and completion of a kick-off meeting.
Specific timelines will be established in the contractor's progress schedule.

Place of Performance
Lower Half Moon Park along Piermont Avenue, Piermont, New York.

Bidder Requirements
Bidders must provide proof of Workmen’s Compensation Insurance and Liability Insurance with minimum coverage amounts specified.
A performance bond for the full amount of the contract is required.
Bidders should be familiar with local conditions and comply with all applicable laws, including prevailing wage requirements under New York State Labor Law.

Overview

Opportunity Type
General
Opportunity ID
2124768
Response Deadline
Aug. 14, 2025 Past Due
Date Posted
July 23, 2025
Est. Value Range
Experimental
$50,000 - $200,000 (AI estimate)
Agency Distribution
High
Source
Source Notes
Must be signed in to the New York Contract Reporter to view the opportunity.
On 7/23/25 Piermont, Village of in New York issued General Concrete Sidewalk Replacement at Lower Half Moon Park with ID 2124768 due 8/14/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Concrete Sidewalk Replacement at Lower Half Moon Park

Classifications

Opportunity Classification
Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Professional Services

Similar Active Opportunities