3531S GVWS Transmission Pipelines
ID: 011850
• State: Nevada
Opportunity Assistant
Loading
Description
The Southern Nevada Water Authority (SNWA) is seeking qualified firms to submit bids for the installation of approximately 44,000 linear feet of 36-inch mortar lined, tape wrapped welded steel transmission pipeline. The scope of work also includes the installation of access manways, drains, air/vacuum release valves (AVARs), fiber optic conduits and pull boxes, and construction of an access road. Additional improvements at the existing SNWA Lamb 2350 Pumping Station will involve modifications to gates and walls, construction of an isolation valve vault, and installation of a hydropneumatic facility. All facilities constructed under this contract will be owned and maintained by SNWA. The work will begin at the Lamb 2350 Pumping Station, located near Lamb Blvd. and the Clark County 215 Bruce Woodbury Beltway, and will continue east toward the future Apex 2330 Forebay and 2920 Pumping Station (to be constructed by others), as well as north toward the future 2920 Reservoir (to be constructed by others). The engineer's estimate for this project is $93,747,199.00. Interested bidders should refer to the Contract Documents for full details and must direct any questions regarding this bid to the Bid Contact listed in the solicitation. The project is referenced under Opportunity ID: 011850, with the place of performance at 1001 S. Valley View Blvd, Las Vegas, NV 89107, USA.
Loading Map
Loading Map
Overview
Opportunity Type
Invitation for Bid
Opportunity ID
011850
Response Deadline
Aug. 4, 2025
Past Due
Date Posted
July 10, 2025
Source
Est. Value Range
Experimental
$93,747,199
(Agency Estimate)
Agency Distribution
High
On 7/10/25 Las Vegas Valley Water District in Nevada issued Invitation for Bid GVWS Transmission Pipelines with ID 011850 due 8/4/25.