UNM Construction Manager at Risk (CMAR) Tow Diehm Athletic Facility Renovation
ID: RFP-2491-23 • State: New Mexico
Opportunity Assistant
Loading
Description
Background
The University of New Mexico (UNM) is seeking qualified construction firms to provide Construction Manager at Risk (CMAR) services for the renovation of the Tow Diehm Athletic Facility.
The goal of this contract is to enhance student athlete spaces, ensuring that the facility meets modern standards and provides a conducive environment for training and development.
Work Details
The project involves the expansion of the Tow Diehm Building student athlete spaces, which includes:
- A Theater addition of approximately 2,367 square feet.
- A Training Room addition of approximately 2,076 square feet specifically for the football team.
- Extensive renovations to create a lobby area.
- Extension of the equipment room.
- Creation of a vestibule connecting locker rooms.
- Minor renovations in adjacent spaces totaling around 2,000 square feet.
- Exterior work including a patio, sidewalk, and retaining wall covering approximately 2,000 square feet.
The project will utilize the CMAR construction delivery method.
Period of Performance
The contract will be performed from May 30, 2024, with proposals due by July 1, 2024.
The specific duration for completion has not been detailed but is expected to align with project milestones outlined in subsequent phases.
Place of Performance
The work will be performed at the University of New Mexico's Tow Diehm Athletic Facility located in Albuquerque, New Mexico.
The University of New Mexico (UNM) is seeking qualified construction firms to provide Construction Manager at Risk (CMAR) services for the renovation of the Tow Diehm Athletic Facility.
The goal of this contract is to enhance student athlete spaces, ensuring that the facility meets modern standards and provides a conducive environment for training and development.
Work Details
The project involves the expansion of the Tow Diehm Building student athlete spaces, which includes:
- A Theater addition of approximately 2,367 square feet.
- A Training Room addition of approximately 2,076 square feet specifically for the football team.
- Extensive renovations to create a lobby area.
- Extension of the equipment room.
- Creation of a vestibule connecting locker rooms.
- Minor renovations in adjacent spaces totaling around 2,000 square feet.
- Exterior work including a patio, sidewalk, and retaining wall covering approximately 2,000 square feet.
The project will utilize the CMAR construction delivery method.
Period of Performance
The contract will be performed from May 30, 2024, with proposals due by July 1, 2024.
The specific duration for completion has not been detailed but is expected to align with project milestones outlined in subsequent phases.
Place of Performance
The work will be performed at the University of New Mexico's Tow Diehm Athletic Facility located in Albuquerque, New Mexico.
Overview
Opportunity Type
RFP
Opportunity ID
RFP-2491-23
Version
1
Response Deadline
Aug. 5, 2024
Past Due
Date Posted
May 30, 2024
Est. Value Range
Experimental
$5,000,000 - $15,000,000
(AI estimate)
Agency Distribution
Low
Source
On 5/30/24 University of New Mexico in New Mexico issued RFP UNM Construction Manager at Risk (CMAR) Tow Diehm Athletic Facility Renovation with ID RFP-2491-23 due 8/5/24.
Contacts
Documents
Posted documents for UNM Construction Manager at Risk (CMAR) Tow Diehm Athletic Facility Renovation
Opportunity Assistant
AI Analysis