Description

Work Requested:
The City of Keene is seeking bid proposals from qualified contractors for the Martel Court Sewer Pump Station Bypass Force Main Project. The scope of work includes, but is not limited to:
  • Furnishing and installing approximately 300 linear feet of 24-inch sewer force main, including force main valves, a valve vault, and related ancillary infrastructure.
  • Open cut installation of 60 feet of force main across the Branch Stream.
  • Selective demolition, removal, and replacement of existing process piping, valves, flow meters, fittings, supports, and related infrastructure.
  • Removal and replacement of approximately 110 linear feet of 12-inch ductile iron gravity sewer main and manhole, including 60 feet of open cut force main installation across the Branch Stream.
  • Furnishing and installing approximately 3,820 square feet of hard armor embankment and sewer pipe (river) crossing protection.
  • Additional site work including restoration, erosion controls, testing, coffer dam installation, paving, loam and seed, dewatering, and other associated ancillary work and restoration as specified in the contract documents.
  • Bypass pumping to maintain operational status of the Sewer Pump Station facility during construction.

Who is Requesting:
The City of Keene.

Background:
This solicitation is for the Martel Court Sewer Pump Station Bypass Force Main Project, which involves significant upgrades and replacements to existing sewer infrastructure to ensure continued and reliable operation.

Contract Requirements:
All work must be performed in accordance with the contract documents and specifications provided by the City of Keene. Contractors must ensure the Sewer Pump Station remains operational throughout construction via bypass pumping.

Instructions on Submission:
Bid proposals must be submitted referencing Opportunity ID: BID #01-26-08. Contractors should review all contract documents for detailed submission requirements and ensure all aspects of the scope are addressed in their proposals.
Loading Map
Loading Map

Overview

Opportunity ID
BID #01-26-08
Response Deadline
May 28, 2026 Due in 26 Days
Date Posted
April 22, 2026
Est. Value Range
Experimental
$500,000 - $1,500,000 (AI estimate)
Agency Distribution
Low
Source
On 4/22/26 City of Keene in New Hampshire issued Martel Court PS Bypass FM Project with ID BID #01-26-08 due 5/28/26.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Subscribe to search 5M+ historical and active solicitation documents

Free Trial Schedule Demo

Opportunity Assistant


Analyst Requests

AI Analysis

Similar Active Opportunities