Prequalification for General Contractors: Utley Creek WRF 8 mgd Expansion Project

ID: 440-22-010b • State: North Carolina
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Summarize the work to be completed under this opportunity
Does this solicitation list any subcontracting requirements?
List any requirements necessary to complete this contract
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Town of Holly Springs, North Carolina is seeking prequalification statements from qualified, experienced General Contractors for Utley Creek WRF 8 mgd Expansion. This project will be bid as a Single Prime contract. Any contractor wishing to be prequalified for the work must complete this application and be approved by the Town of Holly Springs for bidding.
Background
The Town of Holly Springs, North Carolina, is seeking prequalification statements from qualified and experienced General Contractors for the Utley Creek Water Reclamation Facility (WRF) 8 million gallons per day (mgd) Expansion Project. This project aims to upgrade and expand the existing facility to accommodate a maximum monthly design flow of 8 mgd, with provisions for future expansions. The selected design incorporates five-stage biological nutrient removal (BNR) utilizing membrane bioreactors (MBRs) for solids removal.

Work Details
The project includes the following key components:

- Decommissioning existing secondary clarifiers, disk filters, and dewatering equipment.
- Refurbishing the existing ultraviolet (UV) disinfection system.
- Constructing new facilities such as ultra-fine screening, conversion of secondary clarifiers to equalization tanks, reconfiguration of oxidation ditches to a plug flow layout, installation of new MBRs, deoxygenation tanks, a return activated sludge (RAS) pump station, and a new dewatering facility.

Existing infrastructure like the Preliminary Treatment Facility, Influent Pump Station, cascade aerator, and waste activated sludge (WAS) holding tanks will remain operational.

Period of Performance
The estimated start date for construction is March 2026, with a bid date anticipated in November 2025.

Place of Performance
The project will be performed in Holly Springs, North Carolina.

Bidder Requirements
Bidders must possess a valid North Carolina General Contractor’s License and provide evidence of bonding capacity. They must also demonstrate experience in wastewater treatment facility expansion projects with capacities greater than 5 mgd. A minimum score of 80 points on the prequalification evaluation is required for acceptance. Additionally, bidders are encouraged to have a documented plan for engaging subcontractor participation from Historically Underutilized Businesses (HUB).

Overview

Opportunity ID
440-22-010b
Response Deadline
Aug. 27, 2025 Past Due
Date Posted
July 30, 2025
Est. Value Range
Experimental
$50,000,000 - $100,000,000 (AI estimate)
Agency Distribution
High
Source
Source Notes
North Carolina recently changed its procurement system. Old procurements are available at https://www.ips.state.nc.us/IPS/BidNumberSearch.aspx.
On 7/30/25 TOWN OF HOLLY SPRINGS in North Carolina issued Prequalification for General Contractors: Utley Creek WRF 8 mgd Expansion Project with ID 440-22-010b due 8/27/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Prequalification for General Contractors: Utley Creek WRF 8 mgd Expansion Project

Similar Active Opportunities