Piedmont High School Rooftop Unit Replacement Project
ID: 248-5-97648030
• State: North Carolina
Opportunity Assistant
Loading
Description
Background
Union County Public Schools (UCPS) is seeking quotes for the Piedmont High School Rooftop Unit Replacement Project. The project aims to replace several rooftop units (RTUs) at Piedmont High School, ensuring the facility's HVAC system is up to date and functioning efficiently.
The goal is to enhance the school's environment by providing reliable heating and cooling systems.
Work Details
The scope of work includes the direct replacement of the following RTUs:
- RTU 1 CAFE M# J10ZHN15P4AZZ40003B S# NOM9404331
- RTU 2 CAFE M# J10ZHN15P4AZZ40003B S# NOM9404239
- RTU 3 CAFE M# J10ZHN15P4AZZ40003B S# NOM9404330 (Note: existing CAFE units have ERVs which are to be removed and not replaced)
- RTU 4 Kitchen M# J15ZN2454AZZ100005B S# NOM9410896
- Concession at Gym M# 50HSQ00409 S# 4206G20409
- Ag Building M# J03ZJCOOU2AZZ100026 S# NOM9404548
All units must be equipped with factory hail guards and easy access panels. Additionally, all units are required to have a BACNET over IP card and controls integrated per UCPS specifications. All unit disconnect boxes are also to be replaced.
Period of Performance
The contract period will commence upon award and is expected to be completed within a specified timeframe as outlined in the bid documents. Substantial completion is anticipated shortly after the notice to proceed.
Place of Performance
The work will be performed at Piedmont High School located at 3006 Sikes Mill Rd, Monroe, NC 28110.
Union County Public Schools (UCPS) is seeking quotes for the Piedmont High School Rooftop Unit Replacement Project. The project aims to replace several rooftop units (RTUs) at Piedmont High School, ensuring the facility's HVAC system is up to date and functioning efficiently.
The goal is to enhance the school's environment by providing reliable heating and cooling systems.
Work Details
The scope of work includes the direct replacement of the following RTUs:
- RTU 1 CAFE M# J10ZHN15P4AZZ40003B S# NOM9404331
- RTU 2 CAFE M# J10ZHN15P4AZZ40003B S# NOM9404239
- RTU 3 CAFE M# J10ZHN15P4AZZ40003B S# NOM9404330 (Note: existing CAFE units have ERVs which are to be removed and not replaced)
- RTU 4 Kitchen M# J15ZN2454AZZ100005B S# NOM9410896
- Concession at Gym M# 50HSQ00409 S# 4206G20409
- Ag Building M# J03ZJCOOU2AZZ100026 S# NOM9404548
All units must be equipped with factory hail guards and easy access panels. Additionally, all units are required to have a BACNET over IP card and controls integrated per UCPS specifications. All unit disconnect boxes are also to be replaced.
Period of Performance
The contract period will commence upon award and is expected to be completed within a specified timeframe as outlined in the bid documents. Substantial completion is anticipated shortly after the notice to proceed.
Place of Performance
The work will be performed at Piedmont High School located at 3006 Sikes Mill Rd, Monroe, NC 28110.
Overview
Opportunity ID
248-5-97648030
Response Deadline
March 13, 2025
Past Due
Date Posted
Feb. 7, 2025
Source
Source Notes
North Carolina recently changed its procurement system. Old procurements are available at https://www.ips.state.nc.us/IPS/BidNumberSearch.aspx.
Est. Value Range
Experimental
$300,000 - $500,000
(AI estimate)
Agency Distribution
High
On 2/7/25 UNION COUNTY PUBLIC SCHOOLS in North Carolina issued Piedmont High School Rooftop Unit Replacement Project with ID 248-5-97648030 due 3/13/25.
Contacts
Documents
Posted documents for Piedmont High School Rooftop Unit Replacement Project
Opportunity Assistant
AI Analysis
AI Generate