Cooling Tower and Condenser Water Pump Replacement Project

ID: 377-2025-013 • State: North Carolina
Real Time Relevant State, Local, and Education Bids from all 50 States
Find Now

Description

The project scope of work includes replacing one (1) roof-mounted cooling tower and two (2) condenser water pumps installed in the ground floor mechanical room. The intent is for this equipment to be replaced with like equipment as part of scheduled maintenance. The cooling tower controls will be replaced with a new standalone controller that has capability to be remotely monitored. The existing roof supports for the cooling tower will be reused and the existing concrete pads in the mechanical equipment room for the pumps will be replaced. A Non-Mandatory Pre-Bid meeting will be held on January 28, 2025, at 10:00 AM local time at Union County Government Center, 500 N Main St, Room 110, Monroe N.C. Attendance at this meeting is strongly encouraged.
Background
The Union County Government Center is seeking bids for the Cooling Tower and Condenser Water Pump Replacement Project as part of scheduled maintenance.
The project aims to replace essential cooling equipment to ensure operational efficiency and reliability.

Work Details
The scope of work includes:
- Replacing one (1) roof-mounted cooling tower
- Replacing two (2) condenser water pumps located in the ground floor mechanical room.
The new cooling tower will be equipped with a standalone controller that allows for remote monitoring.
Existing roof supports for the cooling tower will be reused, while the concrete pads in the mechanical equipment room for the pumps will be replaced.

Period of Performance
The contract work is expected to commence following the bid award, with specific timelines determined based on contractor availability and project scheduling.

Place of Performance
The work will take place at the Union County Government Center, located at 500 N Main St, Monroe, NC 28112.

Overview

Opportunity ID
377-2025-013
Response Deadline
Feb. 13, 2025 Past Due
Date Posted
Jan. 16, 2025
Est. Value Range
Experimental
$150,000 - $300,000 (AI estimate)
Agency Distribution
High
Source
Source Notes
North Carolina recently changed its procurement system. Old procurements are available at https://www.ips.state.nc.us/IPS/BidNumberSearch.aspx.
On 1/16/25 COUNTY OF UNION in North Carolina issued Cooling Tower and Condenser Water Pump Replacement Project with ID 377-2025-013 due 2/13/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Cooling Tower and Condenser Water Pump Replacement Project

Similar Active Opportunities