Burson Bridge Replacement at UNC Charlotte
ID: 287-29231-CB
• State: North Carolina
Opportunity Assistant
Loading
Description
Background
The Burson Bridge Replacement project is being issued by UNC Charlotte. It aims to enhance campus infrastructure and ensure safe passage for pedestrians and vehicles. This project is part of the university's commitment to maintaining and improving its facilities to support its mission of education and community service.
Work Details
The contract involves the construction of a new bridge to replace the existing Burson Bridge at UNC Charlotte. The work will include:
- Site preparation
- Demolition of the old bridge
- Construction of the new bridge structure
- Installation of necessary utilities
- Landscaping around the bridge area.
Detailed plans and specifications can be obtained from the design firm Walter P Moore during normal office hours.
Period of Performance
The construction work is expected to commence after the bid opening on June 23, 2026, with specific timelines for completion outlined in the project specifications.
Place of Performance
The project will be performed at UNC Charlotte, specifically at the location of the existing Burson Bridge on campus.
Bidder Requirements
Bidders are required to attend a mandatory pre-bid meeting on May 26, 2026, at 10:00 a.m. at UNC Charlotte. A plan deposit of $200 is required to obtain complete plans and specifications.
The Burson Bridge Replacement project is being issued by UNC Charlotte. It aims to enhance campus infrastructure and ensure safe passage for pedestrians and vehicles. This project is part of the university's commitment to maintaining and improving its facilities to support its mission of education and community service.
Work Details
The contract involves the construction of a new bridge to replace the existing Burson Bridge at UNC Charlotte. The work will include:
- Site preparation
- Demolition of the old bridge
- Construction of the new bridge structure
- Installation of necessary utilities
- Landscaping around the bridge area.
Detailed plans and specifications can be obtained from the design firm Walter P Moore during normal office hours.
Period of Performance
The construction work is expected to commence after the bid opening on June 23, 2026, with specific timelines for completion outlined in the project specifications.
Place of Performance
The project will be performed at UNC Charlotte, specifically at the location of the existing Burson Bridge on campus.
Bidder Requirements
Bidders are required to attend a mandatory pre-bid meeting on May 26, 2026, at 10:00 a.m. at UNC Charlotte. A plan deposit of $200 is required to obtain complete plans and specifications.
Loading Map
Loading Map
Overview
Opportunity ID
287-29231-CB
Response Deadline
June 23, 2026
Due in 23 Days
Date Posted
May 19, 2026
Source
Source Notes
North Carolina recently changed its procurement system. Old procurements are available at https://www.ips.state.nc.us/IPS/BidNumberSearch.aspx.
Pre-Bid Conference
Mandatory pre-bid meeting for all interested bidders on May 26, 2026 at 10:00 a.m. at UNC Charlotte. A plan deposit of $200 is required to obtain complete plans and specifications.
Est. Value Range
Experimental
$2,500,000 - $9,000,000
(AI estimate)
Agency Distribution
High
On 5/19/26 UNC - SYSTEM OFFICE DESIGN/CONSTRUCTION in North Carolina issued Burson Bridge Replacement at UNC Charlotte with ID 287-29231-CB due 6/23/26.
Contacts
Documents
Posted documents for Burson Bridge Replacement at UNC Charlotte
Opportunity Assistant
AI Analysis
AI Generate