Search Contract Opportunities

RFB 2821-27 City Hall HVAC Replacement & Installation

ID: 2821-27 • State: Missouri
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Summarize the work to be completed under this opportunity
Does this solicitation list any subcontracting requirements?
List any requirements necessary to complete this contract
I'd like to anonymously submit a question to the procurement officer(s)
Loading
Real Time Relevant State, Local, and Education Bids from all 50 States
Find Now

Description

The City of Branson is soliciting bids for a qualified contractor to provide and install three rooftop HVAC units (RTUs 2, 3, and 4) with comparable Aaon units, or approved equal, at Branson City Hall.
Background
The City of Branson is seeking bids for the replacement and installation of three rooftop HVAC units at Branson City Hall. The goal is to ensure that the HVAC systems are operational and meet the cooling requirements for various operational areas within the building.

Work Details
The contractor will provide all labor, materials, and equipment necessary to install three Aaon rooftop HVAC units (RTUs 2, 3, and 4) or approved equal. The specific tasks include:
1. Providing all necessary controls, motors, fittings, louvers, ductwork, blowers, and related components.
2. Procurement and setup of a crane for installation.
3. Removal and proper disposal of existing equipment.
4. Installation of curbs to support new rooftop units.
5. Setting and securing new HVAC equipment in place.
6. Connecting new units to existing electrical services including fire panel components.
7. Coordination with C&C group for proper connection of back net devices to online software.
8. Installation of condensate drains.
9. Performing equipment start-up and verifying proper operation.
10. Removal of job-related debris from the premises.
11. Duct and electrical modifications as necessary; existing ductwork may be reused if compatible.
12. Compliance with applicable international codes and regulations, obtaining necessary permits from the City of Branson building department.

Period of Performance
The contract will commence upon award and is expected to be completed within a specified timeframe as detailed in the bid documents.

Place of Performance
Branson City Hall, located in Branson, Missouri.

Bidder Requirements
Bidders must be registered with the Missouri Secretary of State and provide documentation of their registration or exemption number if applicable. The contractor must function as the single point of responsibility for all services provided under this contract.

Overview

Agency
Pre-Bid Conference
None
Opportunity ID
2821-27
Response Deadline
Oct. 6, 2025 Past Due
Date Posted
Sept. 5, 2025
Est. Value Range
Experimental
$150,000 - $300,000 (AI estimate)
Agency Distribution
Low
Source
On 9/5/25 Branson in Missouri issued City Hall HVAC Replacement & Installation with ID 2821-27 due 10/6/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for RFB 2821-27 City Hall HVAC Replacement & Installation

Similar Active Opportunities