Background
The City of Florissant is soliciting sealed bids from qualified contractors for the removal and replacement of the existing roofing system and the installation of a new gutter system at the Florissant Golf Course Club House. The goal of this contract is to ensure that all work is completed in accordance with the provided specifications, including all necessary labor, materials, equipment, and incidentals.
Work Details
The contractor shall perform the following tasks:
1. Roofing Replacement:
- Remove and legally dispose of existing roofing materials and debris.
- Inspect wood decking and replace as needed (unit pricing to be provided).
- Re-nail loose decking where required.
- Install aluminum drip edge at all eaves and rake edges.
- Install ice and water shield at eaves (extending 24” past interior wall), valleys, roof penetrations (vents, pipes, chimneys), and roof-to-wall transitions.
- Install two layers of #15 underlayment.
- Install new lead pipe flashings (1-1/2” & 1-4”).
- Install ridge vent system (approx. 138 LF).
- Install roof vents (3-8”, color TBD).
- Install roof-to-wall and step flashing as needed (40 LF, color TBD).
- Detach and reset satellite dish if applicable.
- Install starter strip at all roof edges.
- Install architectural shingles (Owens Corning Duration or approved equal) with 6 nails per shingle.
- Seal all flashing and penetrations with quad sealant.
- Paint pipe flashings to match roof color.
- Perform full site cleanup including magnetic nail sweep, gutter clean, and driveway.
2. Additional Roofing Components:
- Remove and replace copper chimney counter flashing & cricket pan flashing (Size: 8' 7" x 2' 4", Type: Stone, Color: 16 oz. Copper).
- Flash around approximately three 24" x 24" curbs.
- Remove eight fence post mount bracket base flashings.
- Install fencing around AC units.
3. Gutter Replacement:
- Remove existing gutters and haul away all debris.
- Inspect all fascia and replace as needed (unit pricing to be provided).
- Install six seamless gutters (color TBD).
- Install three by four downspouts (color TBD).
- Install gutter guards.
Period of Performance
The project is scheduled to commence after the bid award with specific timelines for completion to be determined by the contractor's proposal.
Place of Performance
Florissant Golf Course Club House located at Florissant, Missouri.
Bidder Requirements
Bidders must comply with prevailing wage requirements as determined by the Department of Labor and Industrial Relations of Missouri. Bidders are also required to provide a complete list of subcontractors proposed for the work, ensuring that no more than 50% of the total contract value is subcontracted out.
The City of Florissant is soliciting sealed bids from qualified contractors for the removal and replacement of the existing roofing system and the installation of a new gutter system at the Florissant Golf Course Club House. The goal of this contract is to ensure that all work is completed in accordance with the provided specifications, including all necessary labor, materials, equipment, and incidentals.
Work Details
The contractor shall perform the following tasks:
1. Roofing Replacement:
- Remove and legally dispose of existing roofing materials and debris.
- Inspect wood decking and replace as needed (unit pricing to be provided).
- Re-nail loose decking where required.
- Install aluminum drip edge at all eaves and rake edges.
- Install ice and water shield at eaves (extending 24” past interior wall), valleys, roof penetrations (vents, pipes, chimneys), and roof-to-wall transitions.
- Install two layers of #15 underlayment.
- Install new lead pipe flashings (1-1/2” & 1-4”).
- Install ridge vent system (approx. 138 LF).
- Install roof vents (3-8”, color TBD).
- Install roof-to-wall and step flashing as needed (40 LF, color TBD).
- Detach and reset satellite dish if applicable.
- Install starter strip at all roof edges.
- Install architectural shingles (Owens Corning Duration or approved equal) with 6 nails per shingle.
- Seal all flashing and penetrations with quad sealant.
- Paint pipe flashings to match roof color.
- Perform full site cleanup including magnetic nail sweep, gutter clean, and driveway.
2. Additional Roofing Components:
- Remove and replace copper chimney counter flashing & cricket pan flashing (Size: 8' 7" x 2' 4", Type: Stone, Color: 16 oz. Copper).
- Flash around approximately three 24" x 24" curbs.
- Remove eight fence post mount bracket base flashings.
- Install fencing around AC units.
3. Gutter Replacement:
- Remove existing gutters and haul away all debris.
- Inspect all fascia and replace as needed (unit pricing to be provided).
- Install six seamless gutters (color TBD).
- Install three by four downspouts (color TBD).
- Install gutter guards.
Period of Performance
The project is scheduled to commence after the bid award with specific timelines for completion to be determined by the contractor's proposal.
Place of Performance
Florissant Golf Course Club House located at Florissant, Missouri.
Bidder Requirements
Bidders must comply with prevailing wage requirements as determined by the Department of Labor and Industrial Relations of Missouri. Bidders are also required to provide a complete list of subcontractors proposed for the work, ensuring that no more than 50% of the total contract value is subcontracted out.
Loading Map
Loading Map
Overview
Agency
Opportunity ID
25-0250-PR
Response Deadline
May 22, 2026
Due in 14 Days
Date Posted
April 30, 2026
Est. Value Range
Experimental
$50,000 - $150,000
(AI estimate)
Agency Distribution
Moderate
Source
On 4/30/26 Parks and Recreation in Missouri issued Florissant Golf Club Roof Replacement & Gutter System Upgrade with ID 25-0250-PR due 5/22/26.
Contacts
Documents
Posted documents for Florissant Golf Club Roof Replacement & Gutter System Upgrade
Opportunity Assistant
AI Analysis
AI Generate