Replace Generator at Minnesota Judicial Building
ID: 9829807
• State: Minnesota
Opportunity Assistant
Loading
Description
The contract work involves replacing the existing generator at the Minnesota Judicial Building. This includes removing and dismantling the current generator, transporting a new generator (provided by the Department of Administration, Facilities Management Division) from storage to the site, and modifying the generator site to relocate it to the east side of the building. The contractor will be responsible for all necessary electrical, mechanical, site work, and concrete construction under a single prime contract. The scope of work also requires the construction and installation of a new retaining wall, drainage system, fencing, and a new concrete pad, as well as making new electrical and fuel piping connections. Placement of the generator will require the use of a crane. The State of Minnesota is requesting this work as part of State Project Number 02JC0043. Plans and specifications for the project were prepared by Erickson Ellison and Associates Inc., Todd Peterson, located at 305 2nd Street NW, Suite 105, New Brighton, MN 55112. This summary is intended as a general guide to the scope of work and should not be interpreted as a detailed list of all contract requirements.
Loading Map
Loading Map
Overview
Opportunity ID
9829807
Response Deadline
Sept. 3, 2025
Past Due
Date Posted
Aug. 11, 2025
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.
Est. Value Range
Experimental
$500,000 - $1,000,000
(AI estimate)
Agency Distribution
Moderate
On 8/11/25 Minnesota Department of Administration in Minnesota issued Replace Generator at Minnesota Judicial Building with ID 9829807 due 9/2/25.
Contacts
Documents
Opportunity Assistant
Analyst Requests
AI Analysis