Search Contract Opportunities

DNR RFP State Fair Fish Pond 6 Water Ctrl Struct

ID: 2000016350 • State: Minnesota

Description

The Minnesota Department of Natural Resources (DNR), Operations Services Division, and Fish and Wildlife Division requests proposals from consulting firms for professional services to perform all work necessary to prepare construction plans and specifications along with providing technical assistance during the bidding process and construction administration of the State Fair Fish Pond 6, Replace Water Control Structure project. Fish Pond 6 is located at the Department of Natural Resources, Region 3 Headquarters' Campus at 1200 Warner Road in St. Paul, Minnesota. This excavated fish holding pond is over 140 years old and the concrete water control structure with access catwalk and stairway of unknown age needs to be replaced.
Background
The Minnesota Department of Natural Resources (DNR), Operations Services Division, and Fish and Wildlife Division is seeking proposals from consulting firms for professional services related to the State Fair Fish Pond 6 project.

The goal of this contract is to prepare construction plans and specifications for the replacement of a water control structure at Fish Pond 6, which is over 140 years old. The existing concrete structure, along with an access catwalk and stairway, requires replacement due to its age and condition. This project aligns with the DNR's mission to manage Minnesota's natural resources sustainably.

Work Details
The contractor will be responsible for:
1. Preparing construction plans and specifications for a new prefabricated concrete water control structure (approx. dimensions: 13 ft high x 8 ft long x 5 ft wide).
2. Removing the existing structure during a two-week period when the pond is drained.
3. Replacing a 20.5 feet long concrete gangway with galvanized steel members and installing a steel safety railing.
4. Replacing existing concrete stairs with prefabricated galvanized stairs on one side only, while removing the existing stairs on both sides.
5. Conducting a video inspection of the existing 24” RCP outlet pipe (estimated length: 600 feet) and amending the contract if repairs are needed.
6. Ensuring that all safety railings and catwalks meet OSHA requirements for pedestrian loading.
7. Deliverables include concept plans, preliminary plans, final design documents, bidding assistance, and construction management support throughout the project lifecycle.

Period of Performance
The contract is anticipated to commence upon Notice to Proceed (NTP) and will be completed by October 30, 2025. Key milestones include:
- Kick-off Meeting: Within 45 days of NTP
- Concept Plans: Due 45 days after NTP
- Preliminary Plans: Due March 21, 2025
- Final Approvals: April 11, 2025
- Bid Opening Date: April 29, 2025
- Award & NTP: May 23, 2025
- Construction Phase: August through September 1, 2025.

Place of Performance
The work will be performed at Fish Pond 6 located at the Department of Natural Resources Region 3 Headquarters Campus at 1200 Warner Road in St. Paul, Minnesota.

Overview

Opportunity Type
RFx
Opportunity ID
2000016350
Version
1
Response Deadline
Nov. 26, 2024 Past Due
Date Posted
Oct. 12, 2024
Est. Value Range
Experimental
$50,000 - $200,000 (AI estimate)
Agency Distribution
High
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.
On 10/12/24 Natural Resources Department in Minnesota issued RFx State Fair Fish Pond 6 Water Control Structure Replacement with ID 2000016350 due 11/26/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for DNR RFP State Fair Fish Pond 6 Water Ctrl Struct

Additional Details

Payment Terms
 
Event Round
1
Event Version
1

Similar Active Opportunities