Secured Front Entry - Millington Jr./Sr. High School
ID: RFP-MILL-250000001014-3
• State: Michigan
Opportunity Assistant
Loading
Description
Background
The Millington Community Schools is seeking to enhance the security of the Millington Jr./Sr. High School by constructing a secured front entry. This project aims to improve safety and access control for students and staff, aligning with the school's mission to provide a safe learning environment.
Work Details
The contractor will be responsible for the following tasks:
1. Demolition of existing concrete surfaces, including saw cutting as per plan.
2. Removal of all trees, brush, fences, buildings, curb, and pavement as shown on the plans or directed by the engineer.
3. Proper disposal of demolition materials in a legally designated area; on-site burning is not permitted.
4. Backfilling excavated areas with clean granular fill compacted to 95% density in 12" lifts.
5. Leaving the work area clean at the conclusion of demolition operations, including topsoiling, seeding, and mulching exposed areas.
6. Verification of all utilities within construction influence and coordination with local utility owners.
Period of Performance
The contract will be performed over a period determined by the project schedule established by Millington Community Schools and the contractor. Specific timelines for each phase of work will be outlined in subsequent communications.
Place of Performance
The work will be performed at Millington Jr./Sr. High School located at 8664 Dean Drive, Millington, MI 48746.
The Millington Community Schools is seeking to enhance the security of the Millington Jr./Sr. High School by constructing a secured front entry. This project aims to improve safety and access control for students and staff, aligning with the school's mission to provide a safe learning environment.
Work Details
The contractor will be responsible for the following tasks:
1. Demolition of existing concrete surfaces, including saw cutting as per plan.
2. Removal of all trees, brush, fences, buildings, curb, and pavement as shown on the plans or directed by the engineer.
3. Proper disposal of demolition materials in a legally designated area; on-site burning is not permitted.
4. Backfilling excavated areas with clean granular fill compacted to 95% density in 12" lifts.
5. Leaving the work area clean at the conclusion of demolition operations, including topsoiling, seeding, and mulching exposed areas.
6. Verification of all utilities within construction influence and coordination with local utility owners.
Period of Performance
The contract will be performed over a period determined by the project schedule established by Millington Community Schools and the contractor. Specific timelines for each phase of work will be outlined in subsequent communications.
Place of Performance
The work will be performed at Millington Jr./Sr. High School located at 8664 Dean Drive, Millington, MI 48746.
Overview
Opportunity Type
Request for Proposals (RFP)
Opportunity ID
RFP-MILL-250000001014-3
Response Deadline
Jan. 28, 2025
Past Due
Date Posted
Jan. 17, 2025
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.
Est. Value Range
Experimental
$500,000 - $1,000,000
(AI estimate)
Agency Distribution
High
On 1/17/25 Millington Community Schools in Michigan issued Request for Proposals (RFP) Secured Front Entry - Millington Jr./Sr. High School with ID RFP-MILL-250000001014-3 due 1/27/25.
Contacts
Documents
Posted documents for Secured Front Entry - Millington Jr./Sr. High School