Search Contract Opportunities

Powell Road Paving and Improvements Project: 305 Mile to 32 Mile Road

ID: 42469 • State: Michigan
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading
Real Time Relevant State, Local, and Education Bids from all 50 States
Find Now

Description

Background
The Macomb County Department of Roads (MCDR) is issuing a solicitation for the Powell Road Paving and Improvements Project. This project aims to enhance the roadway from 30.5 Mile Road to 32 Mile Road in Washington Township, Macomb County. It is part of MCDR's ongoing efforts to improve transportation infrastructure and ensure safe travel for residents and commuters in the area.

Work Details
The project involves the construction of 1.9 miles of Hot Mix Asphalt (HMA) road on Powell Road, which includes: paving an existing gravel road, constructing a right turn lane on 32 Mile Road, tree removal and clearing, station grading, aggregate base installation, aggregate shoulders, HMA pavement application, concrete curb and gutter installation, drainage improvements, removal and replacement of a culvert at the Tributary to East Pond Creek, and pavement markings.

Specific tasks include:
- Clearing: 2 acres
- Tree removal: 14 trees (19-36 inch), 3 trees (37 inch or larger), 126 trees (6-18 inch)
- Curb and gutter removal: 1,060 feet
- Sidewalk removal: 36 square yards
- HMA paving with various specifications including different grades of asphalt
- Installation of drainage structures and culverts with specified dimensions
- Erosion control measures including silt fences and sediment traps.

Period of Performance
The contract work is expected to be completed in two stages: Stage 1 must be completed by November 15, 2025, while Stage 2 must be finished by July 31, 2026.

Place of Performance
The work will take place on Powell Road from 30.5 Mile Road to 32 Mile Road in Washington Township, Macomb County.

Bidder Requirements
Bidders must have current prequalification with the Michigan Department of Transportation in the proper classification required for this work. A satisfactory Bid Bond or certified check amounting to at least 5% of the total bid must accompany each proposal. Bidders must also comply with local preference requirements if applicable.
Loading Map
Loading Map

Overview

Opportunity ID
42469
Response Deadline
Aug. 15, 2025 Past Due
Date Posted
Aug. 1, 2025
Source

Est. Value Range
Experimental
$2,000,000 - $5,000,000 (AI estimate)
Agency Distribution
Low
On 8/1/25 Macomb County Department of Roads in Michigan issued Powell Road Paving and Improvements Project: 305 Mile to 32 Mile Road with ID 42469 due 8/15/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Powell Road Paving and Improvements Project: 305 Mile to 32 Mile Road

Opportunity Assistant


AI Analysis

AI Generate

Similar Active Opportunities