Description
Background
The Massachusetts Bay Transportation Authority (MBTA), a corporate and political subdivision of the Commonwealth of Massachusetts, is issuing this Request for Proposals (RFP) #77-26 for the removal and replacement of existing cooling towers at the South Station Bus Terminal.
The goal of this contract is to ensure the efficient operation of the terminal's cooling systems, which are critical for maintaining comfortable conditions within the facility.
Work Details
The scope of work includes:
1. Removal and replacement of two (2) Marly NC series cooling towers located on the 5th floor of the South Station Bus Terminal.
2. The new cooling towers must match the specifications and size of the existing units, with no modifications expected to the existing roof platform or dunnage.
3. The contractor will be responsible for disconnecting, disassembling, and removing the existing cooling towers from the site.
4. All necessary piping, pipe insulation, wiring, and heat trace must be provided by the contractor.
5. Compliance with all applicable MBTA Engineering Directives & Guidelines is required.
6. The contractor must obtain all necessary permits from Authorities Having Jurisdiction (AHJ), including hoisting and rigging permits if a crane is used.
Period of Performance
The estimated service start date is September 15, 2026, with a completion date no later than April 1, 2027.
Place of Performance
The work will be performed at the South Station Bus Terminal located at 700 Atlantic Ave., Boston, MA.
Bidder Requirements
Bidders must provide a bid deposit of 5% of their bid amount along with their response.
They are required to submit proof of insurance as per MBTA Minimum Insurance Requirements and complete various forms including Form A (Authorized Signatory), Form B (Pre-Award Bidder Evaluation Data Form), and Form C (Pricing Form).
Bidders should also comply with all federal, state, and local laws applicable to public works contracts.
The Massachusetts Bay Transportation Authority (MBTA), a corporate and political subdivision of the Commonwealth of Massachusetts, is issuing this Request for Proposals (RFP) #77-26 for the removal and replacement of existing cooling towers at the South Station Bus Terminal.
The goal of this contract is to ensure the efficient operation of the terminal's cooling systems, which are critical for maintaining comfortable conditions within the facility.
Work Details
The scope of work includes:
1. Removal and replacement of two (2) Marly NC series cooling towers located on the 5th floor of the South Station Bus Terminal.
2. The new cooling towers must match the specifications and size of the existing units, with no modifications expected to the existing roof platform or dunnage.
3. The contractor will be responsible for disconnecting, disassembling, and removing the existing cooling towers from the site.
4. All necessary piping, pipe insulation, wiring, and heat trace must be provided by the contractor.
5. Compliance with all applicable MBTA Engineering Directives & Guidelines is required.
6. The contractor must obtain all necessary permits from Authorities Having Jurisdiction (AHJ), including hoisting and rigging permits if a crane is used.
Period of Performance
The estimated service start date is September 15, 2026, with a completion date no later than April 1, 2027.
Place of Performance
The work will be performed at the South Station Bus Terminal located at 700 Atlantic Ave., Boston, MA.
Bidder Requirements
Bidders must provide a bid deposit of 5% of their bid amount along with their response.
They are required to submit proof of insurance as per MBTA Minimum Insurance Requirements and complete various forms including Form A (Authorized Signatory), Form B (Pre-Award Bidder Evaluation Data Form), and Form C (Pricing Form).
Bidders should also comply with all federal, state, and local laws applicable to public works contracts.
Loading Map
Loading Map
Overview
Opportunity Type
Open Market
Opportunity ID
BD-26-1206-40000-40000-129223
Response Deadline
June 17, 2026
Due in 22 Days
Date Posted
May 13, 2026
Source
Pre-Bid Conference
Pre-bid conference information is referenced in section 3.4, but no requirement details are provided in the excerpt.
Q&A Deadline
Contractors with questions about the wage rates or classifications included on the wage schedule must inquire with DLS at (617) 626-6953.
Est. Value Range
Experimental
$900,000 - $2,200,000
(AI estimate)
Agency Distribution
High
On 5/13/26 Massachusetts Bay Transportation Authority in Massachusetts issued Open Market South Station Bus Terminal Cooling Tower Replacement with ID BD-26-1206-40000-40000-129223 due 6/17/26.
Contacts
Documents
Posted documents for RFP 77-26 South Station Bus Terminal Cooling Tower Replacement
Opportunity Assistant
AI Analysis
AI Generate
Classifications
UNSPSC
721512 - Heating and cooling and air conditioning HVAC construction a
Additional Details
Source Department
400000 - Procurement & Logistics
Source Location
40000 - 400000 Procurement & Logistics