Search Contract Opportunities

Removal of Schoolhouse Pond Dam, Arnold Pond Dam, and Salmon Brook Dams

ID: BD-25-1046-DFW-FW104-108579 • State: Massachusetts

Description

Contract Documents will be available after October 9, 2024 from the Tighe & Bond website located at http://www.tighebond.com/Projects-Out-to-Bid/ Prospective bidders are required to register on the Tighe & Bond website to download Bidding Documents.
Background
The Commonwealth of Massachusetts, through the Department of Fish and Game and the Division of Fisheries and Wildlife, is inviting sealed bids for a project focused on the removal of three dams: Schoolhouse Pond Dam, Arnold Pond Dam, and Salmon Brook Dams.
The goal of this project is to restore natural water flow and improve environmental conditions in the affected areas.

Work Details
The project includes the following specific tasks:
1. **Schoolhouse Pond Dam Removal**:
- Demolition of a concrete, stone, and earthen dam.
- Construction of a precast concrete culvert and wingwalls.
- Construction of a pilot channel through the former impoundment.
- Installation of riprap slope protection.
- Creation of boulder riffle grade control.
- Installation of guardrail.
- Restoration of pavement and streambed.
- Tree plantings at the cemetery located at 20 Armsby Road.
- Site restoration, water control, and miscellaneous work in Sutton, MA.

2. **Arnold Pond Dam Removal**:
- Demolition of the existing concrete, stone, and earthen dam.
- Embankment regrading.
- Installation of a pedestrian bridge with cast-in-place concrete abutments.
- Placement of recovered stone around bridge abutments.
- Site restoration, water control, and miscellaneous work in Sutton, MA.

3. **Salmon Brook Dams Removal**:
- Establishing access routes to dams.
- Demolition of a concrete, stone, and earthen dam as well as a second earthen embankment dam and a stone culvert.
- Site restoration and miscellaneous work in Brookfield, MA.

Period of Performance
The contract work must be completed no later than October 30, 2026.

Place of Performance
The work will be performed in Sutton and Brookfield, Massachusetts.

Overview

Opportunity Type
Open Market
Pre-Bid Conference
A non-mandatory pre-bid meeting will be held on October 22, 2024 at 10:00 AM, local time, at MassWildlife Field Head Quarters at 1 Rabbit Hill Road, Westborough, MA, 01581. MassDOT pre-qualification required.
Opportunity ID
BD-25-1046-DFW-FW104-108579
Response Deadline
Nov. 5, 2024 Past Due
Date Posted
Oct. 11, 2024
Est. Value Range
Experimental
$1,000,000 - $5,000,000 (AI estimate)
Agency Distribution
High
Source
On 10/11/24 Department of Fish and Game in Massachusetts issued Open Market Removal of Schoolhouse Pond Dam, Arnold Pond Dam, and Salmon Brook Dams with ID BD-25-1046-DFW-FW104-108579 due 11/5/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Removal of Schoolhouse Pond Dam, Arnold Pond Dam, and Salmon Brook Dams

Classifications

UNSPSC
721317 - Infrastructure construction

Additional Details

Source Department
DFW - Division of Fisheries and Wildlife
Source Location
FW104 - Division of Fisheries and Wildlife Field Hdqtrs

Similar Active Opportunities