Search Contract Opportunities

Removal of Cusky Pond Dam and Replacement of Barre Rd Culvert

ID: BD-25-1046-DFW-FW104-109326 • State: Massachusetts
Real Time Relevant State, Local, and Education Bids from all 50 States
Find Now

Description

See attached notice to contractors for project details
Background
The Commonwealth of Massachusetts, through the Department of Fish and Game and the Division of Fisheries and Wildlife, is inviting sealed bids for a project aimed at enhancing local infrastructure and environmental conditions.

The project involves the removal of Cusky Pond Dam and the replacement of Barre Road Culvert over Sucker Brook, with the goal of restoring natural water flow and improving safety for road users.

Work Details
The project consists of two main components:

1) Removal of Cusky Pond Dam, which includes establishing an access route to the dam, demolishing an earthen dam, excavating and regrading embankment soils, streambed restoration, site restoration, water control, and miscellaneous work in New Braintree, MA.

2) Replacement of Barre Road Culvert, which involves installation of traffic controls, demolition of the existing corrugated metal culvert, installation of a precast box culvert with associated headwalls and wingwalls, installation of a drain manhole, catch basins, stormwater treatment unit, drain pipe construction, boulder riffle grade control construction, pavement restoration, guardrails installation, chain-link fencing installation, site restoration, water control measures, and miscellaneous work in New Braintree, MA.

The work will be performed according to plans and specifications prepared by Tighe & Bond, Inc.

Period of Performance
The contract work must be completed no later than December 31, 2026.

Place of Performance
The contract will be performed in New Braintree, Massachusetts.

Overview

Opportunity Type
Open Market
Pre-Bid Conference
non-mandatory pre-bid meeting scheduled for 11/19/2024 at 10 am at the MassWildlife Field Headquarters, 1 Rabbit Hill Rd, Westborough, MA.
Opportunity ID
BD-25-1046-DFW-FW104-109326
Response Deadline
Dec. 3, 2024 Past Due
Date Posted
Nov. 6, 2024
Est. Value Range
Experimental
$500,000 - $1,500,000 (AI estimate)
Agency Distribution
High
Source
On 11/6/24 Department of Fish and Game in Massachusetts issued Open Market Removal of Cusky Pond Dam and Replacement of Barre Rd Culvert with ID BD-25-1046-DFW-FW104-109326 due 12/3/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Removal of Cusky Pond Dam and Replacement of Barre Rd Culvert

Additional Details

Source Department
DFW - Division of Fisheries and Wildlife
Source Location
FW104 - Division of Fisheries and Wildlife Field Hdqtrs

Similar Active Opportunities