Search Contract Opportunities

Rail: Ware River Secondary Culvert Replacement at MP 19.84 and MP 19.96

ID: BD-25-1030-0T100-0T100-117708 • State: Massachusetts
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Summarize the work to be completed under this opportunity
Does this solicitation list any subcontracting requirements?
List any requirements necessary to complete this contract
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Rail: Ware River Secondary Culvert Replacement at MP 19.84 and MP 19.96
Background
The Massachusetts Department of Transportation Rail and Transit Division (MassDOT) is seeking contractors for the Ware River Secondary Culvert Replacements at MP 19.84 & MP 19.96 project as part of the FY 2025 Capital Improvement Program. The goal of this contract is to enhance the infrastructure by replacing two railroad culvert crossings on the Ware River Secondary in Gilbertville, MA.

Work Details
The project consists of the following work:
- Removal and disposal of existing twin 8” round corrugated metal culvert at MP 19.84;
- Furnishing and installing a 24” round Class V Reinforced Concrete Pipe (RCP) culvert with precast concrete wingwall and permanent steel sheeting support wall at MP 19.84;
- Removing, resetting, surfacing, and aligning track;
- All other work associated with the Culvert Replacement at MP 19.84 as described in the Project Description and Scope of Work sections of the bid documents;
- Removal and disposal of existing 36” x 36” stone box culvert at MP 19.96;
- Furnishing and installing a 48” round Class V Reinforced Concrete Pipe (RCP) culvert with precast concrete wingwalls at MP 19.96;
- Removing, resetting, surfacing, and aligning track;
- All other work associated with the Culvert Replacement at MP 19.96 as described in the Project Description and Scope of Work sections of the bid documents.

Period of Performance
The contract will be performed until Monday, September 30, 2025.

Place of Performance
The work will be performed in Gilbertville, Massachusetts.

Bidder Requirements
Bidders must have an approved Drug and Alcohol testing plan compliant with Federal Railroad Administration regulations. They must be prequalified by MBTA in Class 1 – General Transit Construction or Class 3 – Trackwork for a contract value of $1.32 million. Bidders must register with COMMBUYS to bid on this project and provide a list of projects of similar size and scope along with references for three such projects. This project has an MBE/WBE participation goal of 6%.

Overview

Opportunity Type
Open Market
Pre-Bid Conference
Thursday, April 24, 2025 at 10:00 AM at the Hardwick Municipal Office Building located at 307 Main St., Hardwick, MA 01031. A site inspection
Opportunity ID
BD-25-1030-0T100-0T100-117708
Response Deadline
July 1, 2025 Past Due
Date Posted
June 6, 2025
Est. Value Range
Experimental
$500,000 - $1,500,000 (AI estimate)
Agency Distribution
High
Source
On 6/6/25 Department of Transportation in Massachusetts issued Open Market Rail: Ware River Secondary Culvert Replacement at MP 19.84 and MP 19.96 with ID BD-25-1030-0T100-0T100-117708 due 7/1/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Rail: Ware River Secondary Culvert Replacement at MP 19.84 and MP 19.96

Additional Details

Alternate ID
Project/Contract # 614056-130141)
Source Department
0T100 - RAIL AND TRANSIT
Source Location
0T281 - RAIL Departmental Contracts
Info Contact
Chalita.Belfield@dot.state.ma.us

Similar Active Opportunities