New Police Station Prequalification
ID: BD-25-1459-BTV11-BTV11-117604 • State: Massachusetts
Opportunity Assistant
Loading
Description
Background
The Town of Burlington, Massachusetts, is issuing a Request for Qualifications (RFQ) for the construction of a new Burlington Police Station. The project involves the demolition of the existing two-story police station and the construction of a new facility exceeding 39,000 square feet. The goal is to provide a modern police station that meets the operational needs of the Burlington Police Department.
Work Details
The project includes:
- Demolition of the existing two-story police station building and basement.
- Construction of a new two-story police station with basement, totaling over 39,000 square feet.
- Features of the new facility will include:
- 3-bay sally port
- Detention areas including booking area, cells, and holding areas
- Administrative offices
- Communication equipment room
- Evidence storage and processing areas
- Locker rooms and fitness room
- A five-lane firing range
- Meeting rooms, storage areas, toilet rooms, and interview rooms.
Period of Performance
The estimated project duration is 600 consecutive calendar days from the start date following the notice to proceed.
Place of Performance
The contract will be performed at 45 Center Street, Burlington, MA 01803.
Bidder Requirements
General Contractors must submit a Statement of Qualifications (SOQ) that includes completed forms and supporting documentation as specified in the RFQ. They must also provide evidence of bonding capacity equal to or greater than 100% of the estimated construction cost ($32,901,865). Additionally, contractors must hold a currently valid Certificate of Eligibility issued by DCAMM.
The Town of Burlington, Massachusetts, is issuing a Request for Qualifications (RFQ) for the construction of a new Burlington Police Station. The project involves the demolition of the existing two-story police station and the construction of a new facility exceeding 39,000 square feet. The goal is to provide a modern police station that meets the operational needs of the Burlington Police Department.
Work Details
The project includes:
- Demolition of the existing two-story police station building and basement.
- Construction of a new two-story police station with basement, totaling over 39,000 square feet.
- Features of the new facility will include:
- 3-bay sally port
- Detention areas including booking area, cells, and holding areas
- Administrative offices
- Communication equipment room
- Evidence storage and processing areas
- Locker rooms and fitness room
- A five-lane firing range
- Meeting rooms, storage areas, toilet rooms, and interview rooms.
Period of Performance
The estimated project duration is 600 consecutive calendar days from the start date following the notice to proceed.
Place of Performance
The contract will be performed at 45 Center Street, Burlington, MA 01803.
Bidder Requirements
General Contractors must submit a Statement of Qualifications (SOQ) that includes completed forms and supporting documentation as specified in the RFQ. They must also provide evidence of bonding capacity equal to or greater than 100% of the estimated construction cost ($32,901,865). Additionally, contractors must hold a currently valid Certificate of Eligibility issued by DCAMM.
Overview
Agency
Opportunity Type
Open Market
Opportunity ID
BD-25-1459-BTV11-BTV11-117604
Response Deadline
June 25, 2025
Past Due
Date Posted
June 11, 2025
Est. Value Range
Experimental
$32,901,865
(Agency Estimate)
Agency Distribution
High
Source
On 6/11/25 Town of Burlington in Massachusetts issued Open Market New Police Station Prequalification with ID BD-25-1459-BTV11-BTV11-117604 due 6/25/25.
Contacts
Documents
Posted documents for New Police Station Prequalification
Opportunity Assistant
AI Analysis
Classifications
UNSPSC
721300 - General building construction
Additional Details
Source Department
BTV11 - Police
Source Location
BTV11 - Police