IFB: Pickerel Pond Bridge Connector. Subject to Build America Buy America and the Davis Bacon Act.
ID: BD-23-1302-NAT01-CPO-128347 • State: Massachusetts
Opportunity Assistant
Loading
Description
Background
The Town of Natick, Massachusetts, is issuing an Invitation for Bids (IFB) for the Pickerel Pond Bridge Connector Construction Project. This project is part of the Town's efforts to enhance local infrastructure and is subject to the Build America Buy America Act and the Davis Bacon Act. These regulations ensure that materials used are produced in the United States and that labor standards are met.
Work Details
The contract involves construction services related to the Pickerel Pond Connector. Specific requirements include compliance with the Build America Buy America Act, which mandates that all iron, steel, manufactured products, and construction materials must be produced in the United States unless a waiver is granted. Additionally, all provisions of the Federal Davis Bacon Act will be incorporated into this contract to ensure adherence to federal wage standards for laborers and mechanics.
Period of Performance
The contract work is expected to commence following the bid award on May 15, 2026. Specific timelines for completion are not detailed in the provided information.
Place of Performance
The construction will take place in Natick, Massachusetts.
Bidder Requirements
Bidders must comply with all instructions outlined in the IFB issued by the Town of Natick. This includes adherence to federal regulations under the Build America Buy America Act and the Davis Bacon Act. No specific set-aside certifications or local requirements were mentioned.
The Town of Natick, Massachusetts, is issuing an Invitation for Bids (IFB) for the Pickerel Pond Bridge Connector Construction Project. This project is part of the Town's efforts to enhance local infrastructure and is subject to the Build America Buy America Act and the Davis Bacon Act. These regulations ensure that materials used are produced in the United States and that labor standards are met.
Work Details
The contract involves construction services related to the Pickerel Pond Connector. Specific requirements include compliance with the Build America Buy America Act, which mandates that all iron, steel, manufactured products, and construction materials must be produced in the United States unless a waiver is granted. Additionally, all provisions of the Federal Davis Bacon Act will be incorporated into this contract to ensure adherence to federal wage standards for laborers and mechanics.
Period of Performance
The contract work is expected to commence following the bid award on May 15, 2026. Specific timelines for completion are not detailed in the provided information.
Place of Performance
The construction will take place in Natick, Massachusetts.
Bidder Requirements
Bidders must comply with all instructions outlined in the IFB issued by the Town of Natick. This includes adherence to federal regulations under the Build America Buy America Act and the Davis Bacon Act. No specific set-aside certifications or local requirements were mentioned.
Loading Map
Loading Map
Overview
Agency
Opportunity Type
Open Market
Pre-Bid Conference
See IFB.
Opportunity ID
BD-23-1302-NAT01-CPO-128347
Response Deadline
May 15, 2026
Due in 8 Days
Date Posted
April 29, 2026
Est. Value Range
Experimental
$500,000 - $2,000,000
(AI estimate)
Agency Distribution
High
Source
On 4/29/26 Town of Natick in Massachusetts issued Open Market Pickerel Pond Bridge Connector with ID BD-23-1302-NAT01-CPO-128347 due 5/15/26.
Contacts
Documents
Posted documents for IFB: Pickerel Pond Bridge Connector. Subject to Build America Buy America and the Davis Bacon Act.
Opportunity Assistant
AI Analysis
AI Generate
Classifications
UNSPSC
721500 - Specialized trade construction and maintenance services
Additional Details
Source Department
NAT01 - Town of Natick
Source Location
CPO - Town Hall