FY26 Centerville Village Sewer Expansion Project South Phase, CWSRF-19085
ID: FY26-IFB-079 • State: Massachusetts
Opportunity Assistant
Loading
Description
Background
The FY26 Centerville Village Sewer Expansion Project – South Phase is issued by the Commonwealth of Massachusetts, specifically the Executive Office of Labor and Workforce Development. The project aims to enhance the sewer infrastructure in Barnstable, MA, and is partially funded by the Massachusetts Clean Water Trust. The goal is to improve wastewater management and ensure compliance with environmental standards.
Work Details
The work includes the construction of approximately 8,600 linear feet of PVC gravity sewer with diameters ranging from 8 inches to 15 inches. It also involves 150 linear feet of 8-inch ductile iron (DI) gravity sewer and 4,000 linear feet of high-density polyethylene (HDPE) low-pressure sewers with diameters from 1.5 inches to 3 inches. This project will involve excavation, installation of piping systems, backfilling, and restoration of disturbed areas.
Period of Performance
The contract is expected to commence on April 10, 2026, and will continue until the completion of the project as per the specified timelines outlined in the contract documents.
Place of Performance
The work will be performed in Barnstable, Massachusetts.
Bidder Requirements
Bidders must comply with prevailing wage laws as determined by the Massachusetts General Laws. Contractors are required to submit weekly payroll reports and a Statement of Compliance directly to the awarding authority. Additionally, all apprentices must be registered with the Massachusetts Division of Apprentice Standards (DAS).
The FY26 Centerville Village Sewer Expansion Project – South Phase is issued by the Commonwealth of Massachusetts, specifically the Executive Office of Labor and Workforce Development. The project aims to enhance the sewer infrastructure in Barnstable, MA, and is partially funded by the Massachusetts Clean Water Trust. The goal is to improve wastewater management and ensure compliance with environmental standards.
Work Details
The work includes the construction of approximately 8,600 linear feet of PVC gravity sewer with diameters ranging from 8 inches to 15 inches. It also involves 150 linear feet of 8-inch ductile iron (DI) gravity sewer and 4,000 linear feet of high-density polyethylene (HDPE) low-pressure sewers with diameters from 1.5 inches to 3 inches. This project will involve excavation, installation of piping systems, backfilling, and restoration of disturbed areas.
Period of Performance
The contract is expected to commence on April 10, 2026, and will continue until the completion of the project as per the specified timelines outlined in the contract documents.
Place of Performance
The work will be performed in Barnstable, Massachusetts.
Bidder Requirements
Bidders must comply with prevailing wage laws as determined by the Massachusetts General Laws. Contractors are required to submit weekly payroll reports and a Statement of Compliance directly to the awarding authority. Additionally, all apprentices must be registered with the Massachusetts Division of Apprentice Standards (DAS).
Loading Map
Loading Map
Overview
Agency
Opportunity Type
IFB
Opportunity ID
FY26-IFB-079
Response Deadline
May 13, 2026
Due in 0 Days
Date Posted
April 15, 2026
Est. Value Range
Experimental
$3,000,000 - $5,000,000
(AI estimate)
Agency Distribution
High
Source
On 4/15/26 Town of Barnstable in Massachusetts issued IFB FY26 Centerville Village Sewer Expansion Project South Phase with ID FY26-IFB-079 due 5/13/26.
Contacts
Documents
Posted documents for FY26 Centerville Village Sewer Expansion Project South Phase, CWSRF-19085
Opportunity Assistant
AI Analysis
AI Generate
Classifications
Additional Details
Questions Due
05/06/2026
Intent to Bid Due Date
05/13/2026