Driveway Replacement at 78 Third Street- Pittsfield Housing Authority
ID: BD-26-1610-RCAT2-RCAT2-128274 • State: Massachusetts
Opportunity Assistant
Loading
Description
Background
The Pittsfield Housing Authority, located in Pittsfield, Massachusetts, is seeking written quotes for a driveway replacement project at 78 Third Street. This project is part of their ongoing efforts to maintain and improve housing facilities under their jurisdiction. The estimated cost for the project is $17,568.
Work Details
The project involves the replacement of the driveway at 78 Third Street. The work must be performed in accordance with the specifications prepared by Hill Engineers, Architects, Planners, Inc. All work must comply with applicable Massachusetts General Laws regarding public contracts and minimum wage rates.
Period of Performance
The quotes for this project are due by May 1, 2026, at 2:00 PM. The specific timeline for the completion of the driveway replacement will be determined upon award of the contract.
Place of Performance
The work will be performed at 78 Third Street, Pittsfield, Massachusetts.
Bidder Requirements
Bidders must submit their quotes electronically via ProjectDog.com. Hard copy quotes will not be accepted. Bidders are advised that all quotes are subject to Massachusetts General Laws c.30B §39M and minimum wage rates as required by M.G.L. c.149 §§26 to 27H inclusive.
The Pittsfield Housing Authority, located in Pittsfield, Massachusetts, is seeking written quotes for a driveway replacement project at 78 Third Street. This project is part of their ongoing efforts to maintain and improve housing facilities under their jurisdiction. The estimated cost for the project is $17,568.
Work Details
The project involves the replacement of the driveway at 78 Third Street. The work must be performed in accordance with the specifications prepared by Hill Engineers, Architects, Planners, Inc. All work must comply with applicable Massachusetts General Laws regarding public contracts and minimum wage rates.
Period of Performance
The quotes for this project are due by May 1, 2026, at 2:00 PM. The specific timeline for the completion of the driveway replacement will be determined upon award of the contract.
Place of Performance
The work will be performed at 78 Third Street, Pittsfield, Massachusetts.
Bidder Requirements
Bidders must submit their quotes electronically via ProjectDog.com. Hard copy quotes will not be accepted. Bidders are advised that all quotes are subject to Massachusetts General Laws c.30B §39M and minimum wage rates as required by M.G.L. c.149 §§26 to 27H inclusive.
Loading Map
Loading Map
Overview
Opportunity Type
Open Market
Pre-Bid Conference
The job site and/or existing building will be available for inspection between 1:00 P.M. and 2:00 P.M. on
April 17, 2026.
Opportunity ID
BD-26-1610-RCAT2-RCAT2-128274
Response Deadline
May 1, 2026
Due in 11 Days
Date Posted
April 16, 2026
Est. Value Range
Experimental
$17,568
(Agency Estimate)
Agency Distribution
High
Source
On 4/16/26 Worcester Housing Authority in Massachusetts issued Open Market Driveway Replacement at 78 Third Street- Pittsfield Housing Authority with ID BD-26-1610-RCAT2-RCAT2-128274 due 4/30/26.
Contacts
Documents
Posted documents for Driveway Replacement at 78 Third Street- Pittsfield Housing Authority
Opportunity Assistant
AI Analysis
Classifications
UNSPSC
301216 - Asphalts
Additional Details
Source Department
RCAT2 - RCAT Central West
Source Location
RCAT2 - RCAT Central West
Info Contact
Robert Penagos 508-635-3330