2026 Allston
ID: BD-26-1030-0P100-0P010-123431
• State: Massachusetts
Opportunity Assistant
Loading
Description
Background
The Massachusetts Department of Transportation (MassDOT) is seeking qualified consultants to perform an independent cost and engineering analysis of the Allston Multimodal Transportation Project in Boston, MA. This project aims to improve multimodal access between the Allston neighborhood and the regional transportation network, upgrade infrastructure for improved highway, bicycle, pedestrian, rail, and transit connections, and facilitate the redevelopment of Beacon Park Yard. Following a significant reduction in federal funding, MassDOT has paused its planned environmental filings and design activities to conduct this analysis to ensure alignment with available resources.
Work Details
The consultant will conduct an independent in-depth project cost analysis and engineering review. Key tasks include:
1) Reviewing existing planning and technical documents to assess current project functions and costs;
2) Analyzing project costs including individual components and interactions;
3) Evaluating budget alignment with current scope;
4) Identifying inconsistencies or unnecessary costs;
5) Confirming funding sources;
6) Assessing reasonable alternatives within the project scope;
7) Conducting a structured risk assessment;
8) Delivering technical documentation for each task.
The analysis will cover various components such as I-90 interchange, local street networks, parkland improvements, and multimodal connections.
Period of Performance
The initial duration of the contract is twelve (12) months from the effective date of a notice-to-proceed issued by MassDOT.
Place of Performance
The work will be performed in Boston, MA, specifically in the Allston neighborhood adjacent to Soldiers Field Road.
Bidder Requirements
Consultants must submit a valid audited overhead rate for their latest closed fiscal year as per MassDOT guidelines. They should also provide an Affirmative Action Certificate if applicable. The M/WBE participation goal for this contract is zero percent (0%). Consultants are required to demonstrate their qualifications through previous relevant projects and provide references.
The Massachusetts Department of Transportation (MassDOT) is seeking qualified consultants to perform an independent cost and engineering analysis of the Allston Multimodal Transportation Project in Boston, MA. This project aims to improve multimodal access between the Allston neighborhood and the regional transportation network, upgrade infrastructure for improved highway, bicycle, pedestrian, rail, and transit connections, and facilitate the redevelopment of Beacon Park Yard. Following a significant reduction in federal funding, MassDOT has paused its planned environmental filings and design activities to conduct this analysis to ensure alignment with available resources.
Work Details
The consultant will conduct an independent in-depth project cost analysis and engineering review. Key tasks include:
1) Reviewing existing planning and technical documents to assess current project functions and costs;
2) Analyzing project costs including individual components and interactions;
3) Evaluating budget alignment with current scope;
4) Identifying inconsistencies or unnecessary costs;
5) Confirming funding sources;
6) Assessing reasonable alternatives within the project scope;
7) Conducting a structured risk assessment;
8) Delivering technical documentation for each task.
The analysis will cover various components such as I-90 interchange, local street networks, parkland improvements, and multimodal connections.
Period of Performance
The initial duration of the contract is twelve (12) months from the effective date of a notice-to-proceed issued by MassDOT.
Place of Performance
The work will be performed in Boston, MA, specifically in the Allston neighborhood adjacent to Soldiers Field Road.
Bidder Requirements
Consultants must submit a valid audited overhead rate for their latest closed fiscal year as per MassDOT guidelines. They should also provide an Affirmative Action Certificate if applicable. The M/WBE participation goal for this contract is zero percent (0%). Consultants are required to demonstrate their qualifications through previous relevant projects and provide references.
Loading Map
Loading Map
Overview
Opportunity Type
Open Market
Opportunity ID
BD-26-1030-0P100-0P010-123431
Response Deadline
Jan. 23, 2026
Past Due
Date Posted
Dec. 8, 2025
Source
Pre-Bid Conference
This Request for Responses invites qualified prospective consultants to submit proposals for professional services for performing an independent cost and engineering analysis of the Allston Multimodal Transportation Project.
Est. Value Range
Experimental
$500,000 - $2,000,000
(AI estimate)
Agency Distribution
High
On 12/8/25 Department of Transportation in Massachusetts issued Open Market Allston Project 2026 with ID BD-26-1030-0P100-0P010-123431 due 1/23/26.
Contacts
Documents
Posted documents for 2026 Allston
Opportunity Assistant
AI Analysis
AI Generate
Classifications
UNSPSC
801000 - Management advisory services
Additional Details
Source Department
0P100MHDOFFOFSCTY - Office of the Secretary
Source Location
0P010 - Secretary's Office