RFP-867 Engineer KSP Post 4 HVAC Replace/Repair E-town KY
ID: RFP-785-2500000185-1 • State: Kentucky
Opportunity Assistant
Loading
Description
Background
The Commonwealth of Kentucky, through the Finance and Administration Cabinet, Division of Engineering and Contract Administration (DECA), is seeking professional engineering services for the Kentucky State Police (KSP). The project involves the replacement and repair of various HVAC systems at KSP Post 4 located at 945 Cameron Ponder Dr., Elizabethtown, Kentucky.
The total budget for design and construction is $5,000,000.00.
Work Details
The selected engineering firm will assess the mechanical HVAC systems and controls across all structures on the KSP Post 4 campus to determine necessary modifications, repairs, and replacements. The consultant team must include at least an Architect, Mechanical Engineer, and Electrical Engineer.
Respondents must provide references from similar projects, including project name, address, completion date, construction amount, and contact information.
Period of Performance
The project schedule includes a design phase divided into four phases: Phase A (90 days), Phase B (30 days), Phase C (90 days), with Phase D to be determined during the design process.
Place of Performance
The contract will be performed at KSP Post 4 located at 945 Cameron Ponder Dr., Elizabethtown, Kentucky.
The Commonwealth of Kentucky, through the Finance and Administration Cabinet, Division of Engineering and Contract Administration (DECA), is seeking professional engineering services for the Kentucky State Police (KSP). The project involves the replacement and repair of various HVAC systems at KSP Post 4 located at 945 Cameron Ponder Dr., Elizabethtown, Kentucky.
The total budget for design and construction is $5,000,000.00.
Work Details
The selected engineering firm will assess the mechanical HVAC systems and controls across all structures on the KSP Post 4 campus to determine necessary modifications, repairs, and replacements. The consultant team must include at least an Architect, Mechanical Engineer, and Electrical Engineer.
Respondents must provide references from similar projects, including project name, address, completion date, construction amount, and contact information.
Period of Performance
The project schedule includes a design phase divided into four phases: Phase A (90 days), Phase B (30 days), Phase C (90 days), with Phase D to be determined during the design process.
Place of Performance
The contract will be performed at KSP Post 4 located at 945 Cameron Ponder Dr., Elizabethtown, Kentucky.
Overview
Opportunity Type
Request for Proposals (RFP)
Opportunity ID
RFP-785-2500000185-1
Response Deadline
Jan. 14, 2025
Past Due
Date Posted
Dec. 20, 2024
Est. Value Range
Experimental
$5,000,000
(Agency Estimate)
Agency Distribution
High
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.
On 12/20/24 Facilities & Support Services in Kentucky issued Request for Proposals (RFP) Engineer KSP Post 4 HVAC Replace/Repair E-town KY with ID RFP-785-2500000185-1 due 1/13/25.
Contacts
Documents
Posted documents for RFP-867 Engineer KSP Post 4 HVAC Replace/Repair E-town KY
Opportunity Assistant
AI Analysis