Search Contract Opportunities

Sewer Construction Quote - 7114 Church Street

ID: Sewer Construction Quote • State: Illinois
Real Time Relevant State, Local, and Education Bids from all 50 States
Find Now

Description

See Attachments
Background
The City of East St. Louis is issuing a contract for the excavation and replacement of a sewer service lateral at 7114 Church Street. This project aims to address the immediate hazard posed by a damaged sewer lateral, which has been deemed unsafe and a risk to public health and safety. The contractor will be required to secure necessary permits from the City’s Regulatory Affairs Department and the Environmental Protection Agency before commencing work.

Work Details
The contractor shall perform the following tasks:

1. Excavate and remove the existing sewer lateral from the connection at the main to within 5 feet of the building wall.

2. Replace the damaged lateral with new PVC SDR 35 pipe, ensuring proper backfilling with excavated soil that is lightly compacted.

3. Determine actual dimensions, layout, and conduct testing as required.

4. Contact local utility companies to verify underground facilities before excavation and obtain necessary dig numbers as per Illinois state law.

5. Provide all necessary labor, materials, equipment, barricades, and traffic control measures in compliance with IDOT standards.

6. Legally dispose of all materials collected during work at their own expense.

7. Coordinate with the City Fire Marshall for access to fire hydrants for water usage during construction.

8. Adhere to Illinois Prevailing Wage laws throughout the project.

Period of Performance
The contractor is expected to mobilize immediately upon award of the contract and commence construction operations within 24 hours of receiving notice to proceed. Work hours are specified as Monday through Friday from 8:00 AM to 4:30 PM, excluding weekends and holidays unless prior written approval is obtained.

Place of Performance
The work will be performed at 7114 Church Street in East St. Louis, Illinois.

Overview

Opportunity ID
Sewer Construction Quote
Response Deadline
April 27, 2025 Past Due
Date Posted
March 27, 2025
Est. Value Range
Experimental
$50,000 - $150,000 (AI estimate)
Agency Distribution
Low
Source
On 3/27/25 City of East St. Louis in Illinois issued Sewer Construction Quote - 7114 Church Street with ID Sewer Construction Quote due 4/26/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Sewer Construction Quote - 7114 Church Street

Similar Active Opportunities