Replace Parking Lot and Repair Storm Sewers
ID: 810-058-034 • State: Illinois
Opportunity Assistant
Loading
Description
Background
The State of Illinois, through the Capital Development Board, is issuing a contract for the replacement of a parking lot and the repair of storm sewers at Lake Land College located in Mattoon, Coles County.
The project aims to enhance the infrastructure of the college and ensure proper drainage and accessibility.
Work Details
The contractor will be responsible for replacing the existing parking lot and repairing storm sewers.
Specific tasks include site preparation, removal of old pavement, installation of new asphalt or concrete surfaces for the parking lot, and necessary repairs to the storm sewer system to ensure effective water management.
The total cost for this project is estimated to be less than $2,000,000.
Period of Performance
The contract work is expected to commence after the bid due date on May 19, 2026, with specific timelines to be determined during the prebid meeting scheduled for April 20, 2026.
Place of Performance
The work will be performed at Lake Land College located at 5001 Lake Land Blvd., Mattoon, Illinois 61938 in Coles County.
Bidder Requirements
MBE/WBE subcontracting and supplier goals apply.
A Project Labor Agreement (PLA) will be applicable to this project. Bidders must follow specific instructions for obtaining plans and bidding documents.
The State of Illinois, through the Capital Development Board, is issuing a contract for the replacement of a parking lot and the repair of storm sewers at Lake Land College located in Mattoon, Coles County.
The project aims to enhance the infrastructure of the college and ensure proper drainage and accessibility.
Work Details
The contractor will be responsible for replacing the existing parking lot and repairing storm sewers.
Specific tasks include site preparation, removal of old pavement, installation of new asphalt or concrete surfaces for the parking lot, and necessary repairs to the storm sewer system to ensure effective water management.
The total cost for this project is estimated to be less than $2,000,000.
Period of Performance
The contract work is expected to commence after the bid due date on May 19, 2026, with specific timelines to be determined during the prebid meeting scheduled for April 20, 2026.
Place of Performance
The work will be performed at Lake Land College located at 5001 Lake Land Blvd., Mattoon, Illinois 61938 in Coles County.
Bidder Requirements
MBE/WBE subcontracting and supplier goals apply.
A Project Labor Agreement (PLA) will be applicable to this project. Bidders must follow specific instructions for obtaining plans and bidding documents.
Loading Map
Loading Map
Overview
Opportunity ID
810-058-034
Response Deadline
May 19, 2026
Due in 31 Days
Date Posted
April 13, 2026
Est. Value Range
Experimental
$1,000,000 - $2,000,000
(AI estimate)
Agency Distribution
Moderate
Source
On 4/13/26 Capital Development Board in Illinois issued Replace Parking Lot and Repair Storm Sewers with ID 810-058-034 due 5/18/26.