PJ Keller Highway Water Main Replacement
ID: Bid #2025-28 • State: Illinois
Opportunity Assistant
Loading
Description
Background
The City of Bloomington, Illinois, is a home rule unit of government established in 1856 and serves as the County Seat of McLean County. The city is located in Central Illinois and has a diverse economy. The purpose of this contract is to replace the water main along PJ Keller Highway, which is part of the city's ongoing efforts to maintain and improve its water infrastructure.
Work Details
The project involves the installation of approximately 770 linear feet (LF) of 12-inch diameter HDPE (PE4710, DR 11) welded water main pipe under the north fork of Lake Bloomington along PJ Keller Avenue. Additionally, approximately 243 LF of 12-inch diameter Ductile Iron Class 52 water main pipe will be installed to connect the new HDPE pipe to the existing 10-inch cast iron water main on each end of the lake crossing.
The scope includes:
A. Installation of two 60-inch access manholes at each end for gate valves and pressure testing equipment.
B. All necessary pipe fittings, excavation and fill, hydromulching and seeding, and pressure testing.
C. Abandonment of the existing 10-inch cast iron water main by filling it with controlled low-strength material (CLSM). The contractor is responsible for supplying all materials and labor required for these tasks.
Period of Performance
The contract work is expected to commence following the bid award anticipated on February 24, 2025, with specific timelines for completion not detailed in the provided information.
Place of Performance
The work will be performed along PJ Keller Avenue in Bloomington, Illinois, specifically under the north fork of Lake Bloomington.
The City of Bloomington, Illinois, is a home rule unit of government established in 1856 and serves as the County Seat of McLean County. The city is located in Central Illinois and has a diverse economy. The purpose of this contract is to replace the water main along PJ Keller Highway, which is part of the city's ongoing efforts to maintain and improve its water infrastructure.
Work Details
The project involves the installation of approximately 770 linear feet (LF) of 12-inch diameter HDPE (PE4710, DR 11) welded water main pipe under the north fork of Lake Bloomington along PJ Keller Avenue. Additionally, approximately 243 LF of 12-inch diameter Ductile Iron Class 52 water main pipe will be installed to connect the new HDPE pipe to the existing 10-inch cast iron water main on each end of the lake crossing.
The scope includes:
A. Installation of two 60-inch access manholes at each end for gate valves and pressure testing equipment.
B. All necessary pipe fittings, excavation and fill, hydromulching and seeding, and pressure testing.
C. Abandonment of the existing 10-inch cast iron water main by filling it with controlled low-strength material (CLSM). The contractor is responsible for supplying all materials and labor required for these tasks.
Period of Performance
The contract work is expected to commence following the bid award anticipated on February 24, 2025, with specific timelines for completion not detailed in the provided information.
Place of Performance
The work will be performed along PJ Keller Avenue in Bloomington, Illinois, specifically under the north fork of Lake Bloomington.
Overview
Agency
Opportunity ID
Bid #2025-28
Response Deadline
Jan. 28, 2025
Past Due
Date Posted
Jan. 9, 2025
Est. Value Range
Experimental
$500,000 - $1,500,000
(AI estimate)
Agency Distribution
Moderate
Source
On 1/9/25 Water/DOES in Illinois issued PJ Keller Highway Water Main Replacement with ID Bid #2025-28 due 1/28/25.