Background
The City of Belleville is issuing a contract for the rehabilitation of the West Plant Outfall at the Belleville Wastewater Treatment Plant (WWTP).
The goal of this project is to improve the outfall structure to ensure compliance with environmental standards and enhance the overall functionality of the wastewater treatment system.
Work Details
The contract involves several key tasks:
1. Removal of the existing outfall structure;
2. Installation of a precast concrete manhole;
3. Installation of outfall pipe, structural support, and check valve;
4. Reconnection of upstream sewer;
5. Installation of temporary and permanent erosion control measures;
6. Site restoration to its original condition post-construction.
The contractor is responsible for providing all necessary labor, equipment, materials, safety programs, and testing as outlined in the contract documents prepared by Thouvenot, Wade & Moerchen, Inc.
Period of Performance
The work is expected to commence upon contract award and must be completed within a specified timeframe that aligns with project requirements detailed in the solicitation documents.
Place of Performance
The work will be performed at the Belleville West Wastewater Treatment Plant located in Belleville, Illinois.
The City of Belleville is issuing a contract for the rehabilitation of the West Plant Outfall at the Belleville Wastewater Treatment Plant (WWTP).
The goal of this project is to improve the outfall structure to ensure compliance with environmental standards and enhance the overall functionality of the wastewater treatment system.
Work Details
The contract involves several key tasks:
1. Removal of the existing outfall structure;
2. Installation of a precast concrete manhole;
3. Installation of outfall pipe, structural support, and check valve;
4. Reconnection of upstream sewer;
5. Installation of temporary and permanent erosion control measures;
6. Site restoration to its original condition post-construction.
The contractor is responsible for providing all necessary labor, equipment, materials, safety programs, and testing as outlined in the contract documents prepared by Thouvenot, Wade & Moerchen, Inc.
Period of Performance
The work is expected to commence upon contract award and must be completed within a specified timeframe that aligns with project requirements detailed in the solicitation documents.
Place of Performance
The work will be performed at the Belleville West Wastewater Treatment Plant located in Belleville, Illinois.
Overview
Agency
Opportunity ID
230748
Response Deadline
Sept. 26, 2024
Past Due
Date Posted
Aug. 28, 2024
Source
Est. Value Range
Experimental
$500,000 - $1,500,000
(AI estimate)
Agency Distribution
Low
On 8/28/24 Belleville in Illinois issued Belleville WWTP West Plant Outfall Rehabilitation with ID 230748 due 9/26/24.
Contacts
Documents
Posted documents for Belleville WWTP West Plant Outfall Rehabilitation
Opportunity Assistant
AI Analysis
AI Generate
Classifications
Opportunity Classification
Wastewater Treatment